Ballakelly, Inniskeen, Co. Monaghan
Planning application 21530
DecisionConditional grant
Decided17 December 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Monaghan County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Monaghan has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballakelly, Inniskeen, Co. Monaghan?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17685Permission for demolition of existing 76.5m2 3-bedroom dormer style semi-detached dwelling, boiler house and steel/perspex canopy, and construction of new 208m2 3-bedroom dormer style semi-detached dwelling. **SIGNIFICANT FURTHER INFORMATION RECEIVED 17/01/2018 to allow for new wastewater treatment system and percolation area** / 0.4 km away / 01 February 2018Granted
- 2560470The development will consist of the renovation and extension of existing single storey dwelling, new site entrance gate and piers, the installation of new wastewater treatment plant, along with all associated site works. *Significant Further Information Received on 03/04/2026* / 0.4 km away / 24 April 2026Granted
- 17374Permission for a two storey dwelling house, domestic garage, new vehicular entrance, waste water treatment sytem and associated site development works. / 0.5 km away / 27 October 2017Granted
- 21631Permission for a 10 year planning permission for the construction of a solar PV and battery energy storage system development on a c.42.23ha site consisting of: (1) New site entrance, internal accesses and entrances and associated site works. (2) Solar panels on ground-mounted frames over an area of c.39.98ha, 15 no. single storey electrical inverter/transformer units, security fencing, CCTV system with pole mounted cameras and landscaping. (3) An enclosed battery energy storage system compound on c. 0.758ha consisting of 48 no. battery storage units (each with associated containerised step-up transformer). 1 no. containerised control room, 1 no. containerised switch room and 1 no. containerised switch gear unit. (4) 2 no. 37kv sub-stations each with an IPP building on c.1.4887ha, one serving the solar PV development, the other serving the battery energy storage system development. (5) 2 no. grid connections to Louth (Monvallet) 275kv substation. (6) A temporary construction compound and (7) All associated ancillary development works. The operational lifespan of the solar PV and battery energy storage system development will be 35 years. A Natura Impact Statement will accompany this application / 0.7 km away / 26 August 2021Granted
- 19820EXTENSION OF DURATION OF 14361: Permission for development that will primarily consist of the refurbishment of the existing Louth 275kV substation & will comprise: Replacement and/or reconfiguration of existing circuit breakers, disconnects, instrument transformers & surge arrestors with equivalent new circuit breakers, disconnects, instrument transformers & surge arrestors; Modificaitons to existing generator room comprising new opes on northern & western elevations to facilitate the provision of a new internal diesel generator; Removal of existing underground oil storage tank & provision of new overground oil storage tank of less than 3,500 litre capacity within the footprint of existing generator room; Relocation of existing 110kV capacitor bank from north east of site compound to north west of site compound; Provision of two new 110kV wing couplers & the replacement of existing 110kV off-line couplers with two new 110kV in-line couplers; Installation of 30 no. protection & control cabins approximately 3.75 metre length & 3.15 metre wide x 3.5 metre height located adjacent to existing bays; Installation of 12 no. new 110kV & 9 no. new 220kV surge arrestors. Installation of 22 no. lightning rods, approximately 2.5 metre high, on top of existing 110kV busbar gantries; Installation of 1 no. new lightning mast, approximatly 15 metres high; Associated extension of site compound to the north by 2,671 square metres to enhance internal vehicular movement within the substation; this will include associated new perimeter fencing on the nothern side of the substation; installation of new electrified fence (approximatly 3.6 metres in height) inside the existing palisade fence (approximately 2.6 metres in height); and all associated site development works. / 0.7 km away / 22 November 2019Granted
- 17444Permission for the continued use of the existing 36m high lattice communication structure carrying communication dishes and antennae, with associated site works within a 2.4m high fenced compound following on from the expiry of the parent permission (LPA Ref: 12166) at existing Louth 220kv substation / 0.8 km away / 27 July 2017Granted
- 2560479Permission for: • Amendments to that previously Granted Planning Permission (Ref: 2560064) • Proposed extension to the North and South of the loading bay area attached to Warehouses No. 7 & 8. • Provision of additional roller shutter door to the Western elevation of Warehouse No.8. • Together with all associated minor elevational changes and associated site works / 0.9 km away / 22 January 2026Granted
- 2162Permission for development consisting of the installation of 1) 1,063m2 of PV (Photovoltaic) solar panels with anti-reflection coating to the southern portion of the existing pitched roof to warehouse no. 5. 2) 3,386m2 of PV (Photovoltaic) Solar Panels with anti reflection coating to both pitches of the existing pitched roof of warehouses No. 6 & 7 together with all associated site works. / 0.9 km away / 07 May 2021Granted