Cornawall Td, Newbliss, Co Monaghan
Planning application 2360285
DecisionConditional grant
Decided05 March 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Monaghan County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Monaghan has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cornawall Td, Newbliss, Co Monaghan?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18215Permission to construct a car park to serve the adjacent Orange Hall including the provision of up to 56 no standard car parking spaces; 4 no disability car parking spaces; upgrade works to existing site entrance; 2 no lighting stands; and all associated ancillary site development works / 0.3 km away / 11 December 2018Granted
- 20215Permission for development consisting of to construct 3 No. poultry houses and 1 No. ancillary general purpose shed/store together with all ancillary structures (to include meal storage bin(s) and soiled water tank(s)) and site works (to include new/relocated site entrance) associated with the above development. This application relates to a development, which is for the purposes of an activity requiring a Licence under part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted with this planning application. / 0.6 km away / 10 August 2020Granted
- 2460398Permission to construct a new dormer style dwelling house with detached domestic garage, form new vehicular site entrance onto public roadway, installation of approved proprietary wastewater treatment system & percolation area, together with all associated site development works / 0.7 km away / 21 January 2025Granted
- 2560503Planning permission for realignment of access and form sight distance of 49m to the southeast direction of junction 2 – LS6210 relating to the previously approved development under planning reference number 19/486. The remaining sightlines at this junction will provide a sight distance of 70m as required under condition 5(l) of the consented development / 0.9 km away / 10 February 2026Granted
- 21446Retain domestic garage and exit onto public road by way of existing entrance. previous planning 97/28 / 1.0 km away / 29 October 2021Granted
- 1961Permission to construct a new free range poultry unit, new litter store, roads underpass, hardened area, vertical meal bins, underground washings, tanks and all ancillary site works. Significant Further Information relates to the submission of a nutrient management plan and a revised site layout plan. / 1.0 km away / 06 June 2019Granted
- 19242Permission for the installation of a meteorological mast with a maximum height of up to 100 metres supported by guy wires for the purpose of measuring and recording meteorological data and all associated site development and reinstatement works. The existing 80 metre meteorological mast, located on the subject site, was erected as exempted development in accordance with Class 20A, Schedule 2, of the Planning and Development Regulations 2001 (as amended). It is proposed to increase the overall height of this existing mast to up to 100 metres. Existing access arrangements to the proposed development site, using a public right of way, will remain unaltered. The operational lifetime of the proposed development will be up to five years. Significant further information relates to a revised development description. / 1.1 km away / 14 November 2019Granted
- 2498Permission to construct new milking parlour with underground slatted tank with all ancillary site works / 1.1 km away / 25 November 2024Granted