KILMANAGHAN, CLARA, CO. OFFALY
Planning application 17174
DecisionConditional grant
Decided06 July 2017
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near KILMANAGHAN, CLARA, CO. OFFALY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17418THE CONSTRUCTION OF A NEW POLYTUNNEL (CIRCA. 1370 M2) AND ALL ASSOCIATED SITE WORKS AND SERVICES. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE RPS 12-61, NIAH 14908002 / 0.8 km away / 06 December 2017Granted
- 20323CONSTRUCTION OF A TWO-STOREY DWELLING (268.4SQ M) & DOMESTIC GARAGE (27SQ M) AND FOR A NEW DOMESTIC ENTRANCE ONTO THE PUBLIC ROADWAY. PERMISSION IS ALSO SOUGHT FOR THE INSTALLATION OF A PACKAGED WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS / 0.8 km away / 18 September 2020Granted
- 18427CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE THE ADDITION OF A NEW BOUNDARY TO THE EAST OF THE SITE, TREATMENT UNIT WITH PERCOLATION AREA AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE / 1.0 km away / 22 January 2019Granted
- 2360075A new dwelling, gated entrance, garage; percolation area with septic tank system and all ancillary site works. / 1.1 km away / 16 October 2023Granted
- 21193CONSTRUCTION OF A STOREY AND A HALF DWELLING, DETACHED RESIDENTIAL GARAGE, PROPRIETARY TREATMENT SYSTEM, PERCOLATION AREA & ALL ANCILLARY SITE WORKS AS PER SUBMITTED DRAWINGS / 1.2 km away / 20 September 2021Granted
- 2360072Retrofit, extend and alter existing dwelling and all associated site works. Permission is also sought for a new waste water treatment system and percolating area / 1.2 km away / 10 October 2023Granted
- 21214A NEW DWELLING, GATED ENTRANCE, GARAGE; PROPRIETARY TREATMENT SYSTEM WITH DISCHARGE TO A PACKAGED TERTIARY UNIT AND ALL ANCILLARY SITE WORKS / 1.3 km away / 19 October 2021Granted
- 2460338The development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear of the panels; • 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter Fencing; • CCTV; • Site access provided from existing site access off Curragh Road (L20171), internal tracks, site landscaping and all associated site enabling and site development works. This planning application is accompanied by a Natura Impact Statement (NIS). / 1.4 km away / 27 January 2025Granted