ST. MARY'S SECONDARY SCHOOL, SCHOOL LANE, EDENDERRY
Planning application 17417
DecisionConditional grant
Decided13 December 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near ST. MARY'S SECONDARY SCHOOL, SCHOOL LANE, EDENDERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19179A SINGLE AND TWO STOREY EXTENSION LOCATED TO THE SOUTH WEST OF THE EXISTING SCHOOL BUILDING. THE PROPOSED EXTENSION SHALL COMPRISE OF A NEW TECHNOLOGY ROOM WITH PREP ROOM, 3 NO CLASSROOMS, A DESIGN AND COMMUNICATIONS GRAPHICS ROOM, A LAB AND SCIENCE ROOM WITH PREP ROOM, A SOCIAL SPACE, INTERNAL STAIRS, LIFT, TOILET FACILITIES, INTERNAL COURTYARD, STEPS AND RAMPS TOGETHER WITH MINOR ALTERATIONS TO THE EXISTING SCHOOL TO FACILITATE THE CONNECTION. THE PROPOSED WORKS ALSO INCLUDE A COVERED CYCLE STAND, LANDSCAPING, TOGETHER WITH ALL ASSOCIATED SITEWORKS / 0.0 km away / 12 June 2019Granted
- 20124A SINGLE STOREY PREFABRICATED UNIT FOR SPECIAL NEEDS EDUCATION TO INCLUDE 1 NO. CLASSROOM, MULTISENSORY ROOM, SAFE BASE, 2 NO. STORES, USER ASSISTED W.C., 2 NO. TOILETS TOGETHER WITH WITH ALL ASSOCIATED SITE WORKS ALL LOCATED TO THE EAST OF THE EXISTING SCHOOL / 0.0 km away / 07 July 2020Granted
- 1933THE RELOCATION OF AN EXISTING CONTAINER, REMOVAL OF EXISTING LOW WALLS AND ERECTING A SINGLE STOREY PREFAB UNIT CONSISTING OF 2 NO. CLASSROOMS WITH NEW FOOTPATHS, RAMP, STEPS TOGETHER WITH ALL ASSOCIATED SITEWORKS ALL LOCATED TO THE SOUTH EAST OF THE EXISTING SCHOOL / 0.0 km away / 25 March 2019Granted
- 19347THE DEMOLITION OF A SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING SEMI-DETACHED, TWO-STOREY DWELLING-HOUSE AND THE CONSTRUCTION OF A NEW TWO-STOREY EXTENSION (81.5 SQ.M) TO THE REAR AND SIDE OF THE EXISTING STRUCTURE AND ALL ASSOCIATED SITE AND DRAINAGE WORKS / 0.1 km away / 10 October 2019Granted
- 24108ERECTION OF A SINGLE STOREY EXTENSION TO THE REAR OF EXISTING SEMI- DETATCHED HOUSE AND FOR THE REMOVAL OF TWO TEMPORARY WOODEN SHEDS AND ONE BOILER HOUSE AND ALSO FOR THE ERECTION OF NEW TIMBER SHEETED GARDEN SHED AT THE REAR OF THE SITE AND ALL ANCILLARY WORKS / 0.1 km away / 27 February 2025Granted
- 18270CONSTRUCTION OF A TWO STOREY EXTENSION TO AN EXISTING SINGLE STOREY DWELLING AND ALL ASSOCIATED SITE WORKS / 0.2 km away / 20 December 2018Granted
- 1991A NEW SINGLE STOREY EXTENSION TO THE FRONT OF THE SCHOOL BUILDING COMPRISING OF NEW TOILETS, SET ROOM, PRINCIPALS ROOM, ADMINISTRATION OFFICE, NEW CORRIDOR, NEW MAIN ENTRANCE PORCH, WORKS TO EXISTING ANCILLARY SANITARY ACCOMMODATION AND ASSOICATED SITE DEVELOPMENT WORKS / 0.2 km away / 26 April 2019Granted
- 2560062The installation of an air source heat pump and enclosure. / 0.2 km away / 30 April 2025Granted