LUMCLOON, CLOGHAN, CO. OFFALY
Planning application 18501
DecisionConditional grant
Decided19 February 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near LUMCLOON, CLOGHAN, CO. OFFALY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460485The proposed development includes the construction of the following: (i) two new independent power provider (IPP) buildings, (ii) two new electrical transformers, (iii) additional air insulated switchgear (AIS) including four new 110kV bays, (v) connection to the grid via the existing 110kV Derrycarney substation, (vi) access to the site is proposed through an upgraded existing entrance onto the R357 regional road consented under planning reference 23/60111 and through the existing Derrycarney 110kV Substation entrance, (vii) all civil engineering works, drainage, internal roads, landscaping, lighting, temporary construction compound and security fencing. / 0.2 km away / 06 February 2025Granted
- 20444THE CONSTRUCTION OF A 33KV SUBSTATION AND SUBSTATION COMPOUND WITH ASSOCIATED ELECTRICAL INFRASTRUCTURE, INCLUDING TRANSFORMER, AND GRID CONNECTION INTO THE PERMITTED DERRYCARNEY 110KV SUBSTATION / 0.2 km away / 12 November 2020Granted
- 2360111An extension to the existing battery energy storage system (BESS) facility (consented under Planning Ref 19/55) the proposed development includes the construction of the following: (i) Open area battery energy storage system (BESS) on lands adjoining the existing BESS facility to the east and south, containing a total of 112 modular battery containers and medium voltage power stations (MVPS). The proposed development will utilise the existing customer (IPP) building and electrical infrastructure to connect to the grid via the 110kV Derrycarney transmission substation, which adjoins the BESS facility, (ii) Access to the site is proposed through an upgraded existing entrance onto the R357 regional road, (iii) All civil engineering works, drainage, internal roads, landscaping, lighting and security fencing. / 0.2 km away / 06 February 2024Granted
- 1955ALTERATIONS TO DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 100MW OF SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID AT LUMCLOON, CLOGHAN, CO. OFFALY IN LIEU OF THAT GRANTED UNDER PLANNING PERMISSION PL2/17/194. PROPOSED ALTERATIONS CONSIST OF; (I) PROVISION OF OPEN AREA BATTERY ENERGY STORAGE SYSTEM (BESS) COMPOUND (AREA OF 6,200 SQM) CONTAINING BATTERY AND CONTROL SYSTEM ENCLOSURES IN LIEU OF THE APPROVED SINGLE STOREY MAIN BUILDING (FLOOR AREA OF 4,536 SQM), (II) ALTERATIONS TO THE APPROVED SWITCHYARD CONTAINING THE PROPOSED 110kV SUBSTATION WHICH WILL INCLUDE (A) CONNECTION TO THE EXISTING ELECTRICITY NETWORK IN LIEU OF THAT APPROVED, (B) INCREASE IN THE SIZE OF THE CONTROL BUILDING (FLOOR AREA 375 SQM) IN LIEU OF THAT APPROVED (FLOOR AREA 200 SQM), AND (C) PROVISION OF A DIESEL GENERATOR AND TRANSFORMER ADJACENT TO THE CONTROL BUILDING, (III) INCREASE IN SIZE (630 SQM), LOCATION AND INTERNAL LAYOUT OF SWITCHGEAR BUILDING IN LIEU OF THAT APPROVED (100SQM), AND (IV) PROVISION OF 110kV TRANSFORMER IN LIEU OF MV SUBSTATION (100 SQM), AND (V) AND ALL ASSOCIATED SITE WORKS / 0.2 km away / 04 April 2019Granted
- 17194DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 100MW OF SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID. THE DEVELOPMENT WILL CONSIST OF (I) A SINGLE STOREY METAL CLAD BUILDING (FLOOR AREA 4,536SQM) TO A HEIGHT OF 9M, WHICH WILL INCLUDE: RECEPTION AREA, OFFICES, BATTERY ROOM, WORKSHOP AREA, WELFARE FACILITIES AND ANCILLARY SERVICES ROOMS, (II) PERIMETER SECURED SWITCHYARD CONTAINING 110KV SUBSTATION, MV SWITCHGEAR ROOM (FLOOR AREA 100SQM) TO A HEIGHT OF 4M, CONTROL BUILDING (FLOOR AREA 200SQM) TO A HEIGHT OF 4M, (III) ALL ANCILLARY DEVELOPMENT, INCLUDING PERIMETER FENCING AND LANDSCAPING, SECURITY HUT AT SITE ENTRANCE, CAR PARKING, ACCESS ROADS, ALL CIVIL ENGINEERING WORKS FOR THE DISPOSAL OF FOUL AND SURFACE WATER, LIGHTING AND SITE ENTRANCE WITH CONNECTION TO THE EXISTING R357 / 0.3 km away / 25 July 2017Granted
- 2360071The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high; a proposed 5.00m wide graded track between an existing site entrance and BESS; internal access tracks; widening of 2no. existing field entrances and all associated development. Two temporary compounds, measuring 5250sqm approx. in overall area, will be established during the construction phase of the solar farm. The planning permission will have a duration of 10-years, with a subsequent operational lifetime of 40- years, after which it will be decommissioned with all associated lands returned to their original use excluding the Silver River bridge crossing, which shall be retained. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application. / 0.7 km away / 20 June 2024Granted
- 18180AN AGRICULTURAL DEVELOPMENT CONSISTING OF AN EXTENSION OF EXISTING SHEDS TO CONTAIN A NEW COW CUBICLE SHED WITH EFFLUENT TANK. A NEW SILAGE PIT AND ALL ASSOCIATED SITE-WORKS / 0.7 km away / 14 June 2018Granted
- 21346CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFLUENT TREATMENT UNIT WITH RAISED SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS / 1.2 km away / 29 July 2021Granted