FERBANE WASTEWATER TREATMENT WORKS, BALLYCLARE ROAD, FERBANE CO. OFFALY
Planning application 21486
DecisionConditional grant
Decided28 September 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near FERBANE WASTEWATER TREATMENT WORKS, BALLYCLARE ROAD, FERBANE CO. OFFALY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19597EXTENSION, CONVERSION OF EXISTING GARAGE INTO HABITABLE SPACE INCLUDING EN-SUITE BATHROOM AND WALK-IN WARDROBE AT FIRST FLOOR, INTERNAL WORKS TO MODIFY EXISTING LAYOUT INCLUDING REMOVAL OF WALLS AND DOORS, NEW DOOR OPENINGS, WALLS, ETC. WITHIN THE EXISTING HOUSE, NEW ROOF STRUCTURES TO REPLACE EXISTING FLAT ROOF, CONSTRUCTION OF A DOMESTIC GARAGE TO REAR AND ALL ANCILLARY WORKS / 0.2 km away / 24 March 2020Granted
- 22564DEMOLITION OF EXISTING EXTENSION, ALTERATION TO THE EXISTING DWELLING ELEVATIONS, CONSTRUCTION OF A NEW EXTENSION TO THE EXISTING DWELLING, AND ALL ASSOCIATED SITE WORKS / 0.3 km away / 10 February 2023Granted
- 2178ERECTION OF 18M LIGHTING POLES WITH LIGHTS AT TOP TO PROVIDE ILLUMINATION FOR GAMES ON THE EXISTING SOCCER PITCH, ASSOCIATED DUCTING AND WIRING AND ALL ANCILLARY WORKS / 0.4 km away / 16 April 2021Granted
- 21405PROPOSED ALTERATIONS TO EXISTING NORTH ELEVATION, CONSISTING OF, THE REMOVAL OF 3 NO EMERGENCY EXIT DOORS AND 1 WINDOW TO EXISTING DEMONSTRATION ROOM AND REPLACEMENT WITH NEW WINDOWS AND RENDERED WALLS, PLANNING PERMISSION FOR PROPOSED CONSTRUCTION OF A NEW WALL TO NORTH ELEVATION AT EXISTING EXIT 4 AND INSTALLATION OF A NEW ROOF VENT, PLANNING PERMISSION FOR PROPOSED INTERNAL ALTERATIONS, CONSISTING OF, THE CONSTRUCTION OF 3 STORE ROOMS AND THE RECONFIGURATION OF THE EXISTING DEMONSTRATION ROOM TO PROVIDE A GENERAL CLASSROOM, AND ALL ASSOCIATED SITE WORKS / 0.4 km away / 24 August 2021Granted
- 2458DEMOLISHING EXISTING DILAPIDATED HOUSE AND FOR THE PROVISION OF 4 NO RESIDENTIAL UNITS COMPRISING 1 NO STUDIO APARTMENT AND 3 NO. MAISONETTE APARTMENTS (3 NO. 1 BED) MEASURING 232.6 SQ M. THE DEVELOPMENT ALSO PROPOSES CYCLE PARKING; HARD AND SOFT LANDSCAPING; BALCONIES; SOLAR PANELS; BOUNDARY TREATMENTS; BIN STORAGE; CONNECTION TO THE EXISTING PUBLIC FOUL SEWER: CONNECTION TO THE EXISTING WATER MAINS SERVICES ON SITE AND ALL ASSOCIATED SITE WORKS. RETENTION PERMISSION IS SOUGHT FOR THE PIECEMEAL DEMOLITION CARRIED OUT TO DATE TO ENSURE THE SAFETY OF ADJOINING RESIDENTS AND BUSINESSES / 0.4 km away / 23 January 2025Granted
- 19216CONVERSION OF ATTACHED DOMESTIC GARAGE INTO BEDROOM AND EN-SUITE, TWO SEPERATE DOMESTIC GARDEN STRUCTURES INCLUDING STORAGE AND HOBBY ROOM AND ALL ANCILLARY WORKS / 0.4 km away / 04 July 2019Granted
- 20394CONSTRUCTION OF A TWO STOREYED SEMI-DETACHED HOUSE BLOCK (2 HOUSES), NEW ENTRANCES AND CONNECTION TO EXISTING FOUL AND SURFACE WATER SEWER / 0.5 km away / 20 October 2020Granted
- 2560651A change of use from a commercial unit to a single dwelling with alteration of an existing structure including significant changes to the front and side elevations and all ancillary site works / 0.5 km away / 07 April 2026Granted