KILMURRY, TULLAMORE, CO. OFFALY
Planning application 216
DecisionConditional grant
Decided08 March 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near KILMURRY, TULLAMORE, CO. OFFALY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460414Dwelling house with revised layout, including S 2000 effluent treatment system and all associated site works and permission to extend house. / 0.3 km away / 12 December 2024Granted
- 23335ALTERATIONS TO PREVIOUSLY APPROVED PLANNING PERMISSION REFERENCE 21-504 AT KILMURRY, TULLAMORE, CO. OFFALY. THE ALTERATIONS CONSIST OF THE FOLLOWING REVISED DWELLING DESIGN, REVISED DWELLING AND GARAGE LOCATION AND REVISED SITE BOUNDARIES / 0.3 km away / 11 September 2023Granted
- 21504A NEW DWELLING HOUSE, DETACHED GARAGE, NEW SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS / 0.3 km away / 07 October 2021Granted
- 18448CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE AND SEPTIC TANK WITH PERCOLATION AREA AND ASSOCIATED SITE WORKS / 0.6 km away / 07 December 2018Granted
- 20303CONSTRUCTION OF A SLATTED SHED WITH LAY BACK AREA,CATTLE CRUSH, CONCRETE YARD & ALL ANCILLARY SITE WORKS / 0.8 km away / 11 September 2020Granted
- 2149CONSTRUCTION OF A STOREY & HALF EXTENSION (127.8 SQ.M) TO THE REAR (NORTHWEST) AND SINGLE STOREY EXTENSION (11.2 SQ.M) TO THE SIDE (SOUTHWEST) OF THE EXISTING DWELLING. PERMISSION IS SOUGHT FOR ALTERATIONS TO THE EXISTING DWELLINGS ROOF LINE PROFILE AND WINDOWS ON ALL ELEVATIONS OF THE EXISTING DWELLING. PERMISSION IS ALSO SOUGHT TO CLOSE THE EXISTING DOMESTIC ENTRANCE AND TO UPGRADE EXISTING NORTHEAST ENTRANCE FOR DOMESTIC USE ONTO THE PUBLIC ROAD. PERMISSION IS ALSO SOUGHT TO DECOMMISSION THE EXISTING SEPTIC TANK AND PERCOLATION AREA AND TO INSTALL A PACKAGED WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS. / 0.9 km away / 02 June 2021Granted
- 18433(A) DOMESTIC FUEL SHED (B) A SINGLE STOREY EXTENSION TO THE FRONT OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS / 0.9 km away / 29 November 2018Granted
- 218A 10 YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF, AND A 40 YEAR OPERATION AND SUBSEQUENT DECOMMISSIONING OF, A DEVELOPMENT CONSISTING OF A 52.75 HECTARE SOLAR FARM AND BATTERY ENERGY STORAGE SYSTEM AND 9.32 KILOMETRE UNDERGROUND ELECTRICITY GRID CONNECTION (0.95 HECTARES) GIVING A TOTAL COMBINED AREA FOR BOTH THE SOLAR FARM, BATTERY ENERGY STORAGE SYSTEM AND UNDERGROUND ELECTRICITY GRID CONNECTION OF 53.7 HECTARES. THE PROPOSED SOLAR FARM AND BATTERY ENERGY STORAGE SYSTEM WILL CONSIST OF A SERIES OF GROUND MOUNTED SOLAR PHOTOVOLTAIC (PV) PANELS MOUNTED ON STEEL SUPPORT STRUCTURES, TOGETHER WITH A SINGLE STOREY ESB SUB-STATION BUILDING ON SITE, 18 NO. ELECTRICAL TRANSFORMATION ENCLOSURES, 68 NO. BATTERY ENERGY STORAGE UNITS, A TEMPORARY CONSTRUCTION COMPOUND, UNDERGROUND CABLING, INVERTERS, CCTV POLES AND CAMERAS, DEER TYPE SECURITY FENCING, PALISADE FENCING, ACCESS TRACKS, LANDSCAPING AND BIODIVERSITY MEASURES AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS, FOR THE PURPOSE OF GENERATING RENEWABLE ENERGY ELECTRICITY AT THE TOWNLANDS OF DERRIES AND LACKAN. THE PROPOSED 9.32 KILOMETRE UNDERGROUND ELECTRICITY GRID CONNECTION WILL CONSIST OF UNDERGROUND; 13 JOINT BAYS, 13 LINK BOXES AND 13 COMMUNICATIONS CHAMBERS. THE PROPOSED UNDERGROUND ELECTRICITY GRID ROUTE PASSES UNDERNEATH THE WOOD OF O BRIDGE A PROTECTED STRUCTURE ON THE GRAND CANAL. THE PROPOSED SOLAR FARM IS LOCATED IN THE TOWNLANDS OF DERRIES AND LACKAN, CO. OFFALY. THE PROPOSED UNDERGROUND ELECTRICITY GRID CONNECTION IS TO BE INSTALLED ENTIRELY UNDER PUBLIC ROADS FROM THE PROPOSED SOLAR FARM AT DERRIES AND LACKAN TOWNLANDS TO THORNSBERRY 110KV ESB SUBSTATION, WHICH PASSES THROUGH THE TOWNLANDS OF DERRIES, KILMURRY, DERRYGROGAN LITTLE, DERRYGROGAN BIG, WOOD OF O, CORNDARRAGH, DERRYNAGALL OR BALLYDALY, ARDAN AND PUTTAGHAN, CO. OFFALY. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THIS APPLICATION / 0.9 km away / 23 November 2021Granted