WOODFIELD OR TULLYNISK, BIRR, CO. OFFALY
Planning application 21733
DecisionConditional grant
Decided31 January 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near WOODFIELD OR TULLYNISK, BIRR, CO. OFFALY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21732INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM TOGETHER WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS / 0.2 km away / 05 May 2022Granted
- 2360140A ten year Planning Permission. The development will consist of: (i) The provision of underground electrical cabling (38kV) from the townland of Townparks to the existing Dallow 110kV substation in the townland of Clondallow to facilitate the connection of the proposed Carrig Renewables Wind Farm development to the national grid; (ii) Provision of 4 no. joint bays, communication chambers and earth sheath links along the proposed underground electrical cabling route; (iii) Reinstatement of the road or track surface above the proposed cabling trench along existing roads and tracks; and, (iv) All associated site development works, ancillary works and apparatus considered necessary to facilitate the proposed development. The development subject of this application will facilitate the connection of the proposed 7 no. wind turbine Carrig Renewables Wind Farm to the national electricity grid. A concurrent application for the Carrig Renewables Wind Farm development has been lodged to Tipperary County Council. The proposed development includes underground cabling works located within the public road corridor within the curtilage of a Protected Structure (Tipperary RPS Ref. TRPS519 Croghan Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted to the planning authority with the application / 0.5 km away / 02 May 2024Granted
- 22672A NEW PRIMARY SCHOOL FOR GAELSCOIL NA LAOCHRA. THE DEVELOPMENT WILL CONSIST OF THE CONSTRUCTION OF A NEW 4 CLASSROOM, 1 SEN BASE SCHOOL, GENERAL PURPOSE HALL, AND ALL ANCILLARY TEACHING SPACES AND SERVICES, SITE WORKS AND LANDSCAPING TO INCLUDE NEW ACCESS ROAD AND ENTRANCE OFF NEW DISTRIBUTOR ROAD, ATTENUATION TANKS, CAR PARKING AND SET DOWN, AND ALL ASSOCIATED SITE WORKS AND SERVICES / 1.3 km away / 10 May 2023Granted
- 22274THE FOLLOWING: ERECTION OF A FULLY SERVICED RESIDENTIAL HOUSING DEVELOPMENT OF 40 UNITS, CONSISTING OF 4.NO SINGLE STOREY SEMI-DETACHED 2 BEDROOM BUNGALOWS, 2 NO. SINGLE STOREY MID-TERRACE 1 BEDROOM BUNGALOWS, 20.NO. 3 BEDROOM 2 STOREY SEMI-DETACHED HOUSES, 6.NO. 3 BEDROOM 2 STOREY MID-TERRACE HOUSES AND 8. NO. 1 BEDROOM APARTMENTS IN 4 NO. 2 STOREY SEMI-DETACHED BLOCKS, WITH ALL ASSOCIATED SITE SERVICES, LANDSCAPING, SITE WORKS, BOUNDARY TREATMENTS, AND NEW ACCESS / 1.3 km away / 20 January 2023Granted
- 2460229The development will consist of the Construction of a new single-storey extension to the southwest of the existing school building, which comprises six Classrooms and two Science Laboratories, including related accommodation and linking works to the existing school building. Refurbishment of existing Mainstream Classrooms to form a new two-classroom Special Needs Unit and the construction of a new single-storey extension to the northeast of the existing school building. Replacement of selected existing steel framed windows with new thermally broken powder-coated steel windows. Construction of a new Boiler House and Storage Shed on the South side of the existing school building. Associated site development works, including staff carpark realignment with new fencing with gates and a new replacement Ball Court to the east of the school buildings with all associated site development works. / 1.3 km away / 07 November 2024Granted
- 17127CONSTRUCTION OF A THREE CLASSROOM, SINGLE STOREY EXTENSION TO ST. BRENDAN'S COMMUNITY SCHOOL WITH ASSOCIATED SITE DEVELOPMENT WORKS / 1.3 km away / 02 June 2017Granted
- 17497(A) CHANGE OF USE OF PRE EXISTING OUTBUILDING TO COFFEE SHOP, RETENTION OF ADJOINING RESIDENTIAL UNIT AND PERMISSION FOR CHANGE OF USE FROM RESIDENTIAL UNIT TO STORE ANCILLARY TO COFFEE SHOP, RETENTION OF SEPTIC TANK AND PERCOLATION AREA SERVICING COFFEE SHOP, RETENTION OF POLYTUNNEL, RETENTION OF FREE STANDING TIMBER CLADDED SHOP UNIT, ALL AS CONSTRUCTED AND ANCILLARY TO EXISTING GARDEN CENTRE (B) PERMISSION FOR ADDITION AND ALTERATIONS TO EXISTING COFFEE SHOP, PERMISSION TO ERECT NEW POLYTUNNEL, PERMISSION FOR ALL ANCILLARY SIGNAGE, PERMISSION TO RELOCATE EXISTING VEHICULAR ENTRANCE ON NORTH EAST BOUNDARY WITH ON SITE CAR PARKING AND ALL ANCILLARY SITE WORKS / 1.4 km away / 21 May 2018Granted
- 23434CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS / 1.4 km away / 28 March 2024Granted