TRASCAN, PORTARLINGTON, CO. OFFALY
Planning application 23253
DecisionConditional grant
Decided09 October 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near TRASCAN, PORTARLINGTON, CO. OFFALY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460022Planning Permission for a change of house design from that granted permission under planning permission number 23/253, and all associated site works and services, at Trascan, Portarlington, Co. Offaly. / 0.0 km away / 21 March 2024Granted
- 1869THE CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC GARAGE, NEW SITE ENTRANCE, SEPTIC TANK/TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS / 0.6 km away / 31 August 2018Granted
- 2360231The construction of a dwelling house, domestic shed, new entrance, effluent treatment system, percolation area and all associated site works / 0.6 km away / 10 July 2024Granted
- 22390DEVELOPMENT OF A SOLAR FARM CONSISTING OF SOLAR PV PANELS MOUNTED ON STEEL SUPPORTED STRUCTURES WITH ASSOCIATED CABLING AND DUCTING; THE LAYING OF AN UNDERGROUND CABLE IN THE PUBLIC ROADWAY FOR THE PURPOSE OF GRID CONNECTION VIA AN OFF-SITE SUBSTATION; 18 NO. SINGLE STOREY INVERTER STATIONS; 2 NO. STEEL STORAGE CONTAINERS; PALISADE PERIMETER FENCING 2.45M IN HEIGHT; DOUBLE PALISADE SECURITY GATES; PERMEABLE GRAVEL ACCESS TRACK; 20 NO. ON-SITE POLE MOUNTED CCTV CAMERAS C. 3M IN HEIGHT; 1 NO. TEMPORARY CONSTRUCTION COMPOUND/MATERIAL STORAGE AREA; AND 1 NO.TEMPORARY CONSTRUCTION STAGE MOBY DICK TYPE WHEEL WASH SYSTEM (WITH OVERGROUND SETTLEMENT TANK); AND ALL ASSOCIATED ANCILLARY DEVELOPMENT SERVICES AND WORKS, ALL TO BE PROVIDED WITHIN A TOTAL OVERALL APPLICATION BOUNDARY OF 39.23 HA. PERMISSION IS SOUGHT FOR THE PROPOSED SOLAR FARM FOR A PERIOD OF 10 YEARS WITH AN OPERATIONAL PERIOD OF 40 YEARS. AN APPLICATION TO OBTAIN PERMISSION FOR THE DEVELOPMENT OF ASSOCIATED TRANSMISSION INFRASTRUCTURE WHICH CONSISTS OF A 110 KILOVOLT (KV) SUBSTATION AND GRID CONNECTION TO FACILITATE THE EXPORT OF POWER FROM THE SOLAR FARM WILL BE SUBMITTED TO AN BORD PLEANALA. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED FOR THIS DEVELOPMENT AND SUBMITTED AS PART OF THE PLANNING APPLICATION / 0.6 km away / 18 October 2023Granted
- 1972CONTRUCTION OF SINGLE STOREY EXTENSIONS AND ALTERATIONS TO EXISTING DWELLING HOUSE, A STANDALONE GRANNY FLAT, A NEW WASTE TREATMENT SYSTEM AND ASSOCIATED SITE WORKS / 0.6 km away / 27 May 2019Granted
- 1717SHED TO REAR OF EXISTING DWELLING ALONG SOUTH BOUNDARY / 0.6 km away / 10 March 2017Granted
- 2560440A new slatted and cubicle bovine animal accommodation shed with slatted waste storage and all associated site works / 0.7 km away / 19 December 2025Granted
- 2660179Construct new dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site works. Permission is also sought for mobile home on site for the duration of construction / 0.7 km away / 16 June 2026Granted