Mid Ireland Adventure, The Marina Banagher, Co. Offaly
Planning application 2460295
DecisionRefused
Decided26 September 2024
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Mid Ireland Adventure, The Marina Banagher, Co. Offaly?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360136An existing shop unit (17.4 SqM) & 2 No. signs thereon, an existing mobile sauna unit (4.3 SqM) and associated site works / 0.0 km away / 29 November 2023Refused
- 18514CONVERSION TO PART OF MY EXISTING HOUSE FROM DOMESTIC USE TO COMMERCIAL USE BY OPENING A PEDESTRIAN ENTRANCE DOOR THROUGH PART OF MY EXISTING DWELLING GROUND FLOOR, FOR ACCESS TO A PROPOSED GLAMPING SITE TO INCLUDE 5 NO. 4-PERSON CAPACITY GLAMPING CABINS TO THE REAR OF MY EXISTING PROPERTY WHICH IS PART OF THE CURTILAGE OF A PROTECTED STRUCTURE, ALSO 12 NO. OFF-STREET PARKING SPACES ARE TO BE PROVIDED TO THE REAR OF THE EXISTING SUPER VALUE SHOPPING FACILITY OPPOSITE MY PREMISES. SITE WORKS TO INCLUDE RE-CONNECTION TO THE EXISTING PUBLIC FOUL SEWER AND EXISTING WATER MAINS SERVICES ON SITE AND ALL ASSOCIATED SITE WORKS / 0.3 km away / 22 January 2019Refused
- 18348CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, BOUNDARY FENCING, USE OF EXISTING ENTRANCE AND CONNECTIONS TO EXISTING SERVICES; ALL COMPLETED WITH ASSOCIATED SITEWORKS / 0.9 km away / 02 October 2018Refused
- 19321THE CONSTRUCTION OF A SINGLE STOREY GARDEN HOUSE (LOG CABIN TYPE) FLOOR AREA 75M2 WITH CONNECTION TO MAIN FOUL SEWER / 1.2 km away / 27 August 2019Refused
- 22923For the construction of a single storey dwelling and garage, wastewater treatment system, percolation area, new entrance, driveway and all associated site development works. Gross floor space of proposed works: 219.8sqm / 1.5 km away / 12 April 2023Refused
- 18104CONSTRUCTION OF A REAR ACCESS GATE TO EXISTING DWELLING'S SIDE BOUNDARY WALL AND ALL ASSOCIATED SITE WORKS / 1.5 km away / 26 April 2018Refused
- EX2600421/170 FOR THE DEMOLITION OF A TWO-STOREY EXTENSION TO THE EAST, PORCH TO THE WEST AND BOTH CHIMNEYS OF THE EXISTING DWELLING, WITH THE CONSTRUCTION OF A TWO-STOREY EXTENSION TO EAST AND SOUTH AND A SINGLE STOREY EXTENSION TO THE NORTH EAST WITH ASSOCIATED INTERNAL MODIFICATIONS, ADJUSTMENTS TO EXISTING WINDOWS TO THE WEST, ADDING ROOFLIGHTS TO THE EAST, REPLACING WINDOWS AND DOORS THROUGHOUT, THE BLOCKING UP OF THE EXISTING SITE ENTRANCE, AMENDMENTS TO THE EXISTING ROADSIIDE BOUNDARY WITH THE CREATION OF A NEW SITE ENTRANCE, AND ALL ASSOCIATED SITE WORKS, INCLUDING A PROPOSED SEPTIC TANK AND PERCOLATION AREA / 2.7 km away / 19 May 2026Refused
- 2461251For: (a) Conservation and protection of all existing viable trees and woodland areas and the natural environment as a fundamental objective of the development and the extensive planting of additional native tree species, as well as other planting proposals in keeping with biodiversity objectives, the design heritage of the estate and the proposed development. A small number of minor and diseased trees are proposed for removal to accommodate safe site circulation. (b) Construction of a visitor centre comprising a restaurant, café and gift shop, which will be fully universally accessible with interpretation and visitor servicing. (c) The provision of 10 no. timber shepherd's huts raised above ground levels, to conserve existing ground conditions and preserve through routes for movement of wildlife. The huts, arranged in a cluster, are confined to the north eastern portion of the lands, carefully respond to their specific site context, respecting existing woodlands and topographical conditions. The provision of an external guest communal area. (d) Provision of 2 no. butterfly domes, a garden dome with internal water feature, a media dome, vivarium and mining experience to provide interactive immersive experiences, enhancing awareness and promoting environmental stewardship. (e) Construction of a playground and petting farm area. (f) Provision of sensitively designed landscaped areas, including paths and paved terraces, native, ornamental and screen planting; seated areas; timber cycle shelters and pergolas and water features. Resurfacing of existing pathways with minor extensions and realignments to avoid tree canopy overhangs. (g) Sustainable energy sources with the use of roof-mounted renewable solar photovoltaic panels and plant. (h) Provision of an entrance gate to provide vehicular access from the R356, with related walls and signage, demolition of existing boundary wall and new hedgerow with post and rail fence to define boundary. (i) Construction of 1 no. permeable asphalt surfaced car park providing a total of 250 no. car parking spaces including 18 no. designated parking spaces and 6 no. bus parking spaces and a separate recreational vehicle (RV) area. The majority of the parking bays will be gravel and the designated parking bays will be asphalt. The car parking provision includes for the future installation of EV charging facilities for 20% of the car parking spaces. (j) Provision of public lighting/foul sewer drainage & all site works. (NIS) / 3.5 km away / 14 November 2024Refused