Thomastown Demense, Rath, Birr
Planning application 2560045
DecisionConditional grant
Decided17 April 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Offaly County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Offaly has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Thomastown Demense, Rath, Birr?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17501THE CONSTRUCTION OF A NEW DOMESTIC STORAGE SHED AND ASSOCIATED SITE WORKS / 0.1 km away / 16 February 2018Granted
- 2148DEMOLITION OF EXISTING DWELLING HOUSE AND FUEL SHED, AND THE CONSTRUCTION OF A REPLACEMENT DWELLING COMPRISING A PART TWO-STOREY HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, SITE ENTRANCE AND ALL ANCILLARY SITE WORKS THERETO. / 0.1 km away / 01 April 2021Granted
- 1918(A) EXISTING EXTENSION TO THE SOUTH OF THE EXISTING SCHOOL BUILDING THAT INCLUDES A STAFF ROOM, NEW OFFICE, RESOURCE ROOM AND ALTERATIONS TO THE EXISTING ADJOINING ROOMS AND (B) PERMISSION FOR CONSTRUCTION OF A NEW SINGLE STOREY CLASSROOM EXTENSION TO THE NORTH OF THE EXISTING SCHOOL BUILDING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING ALTERATIONS AND FUTURE UPGRADING OF EXISTING FOUL DRAINAGE SYSTEM / 0.5 km away / 16 April 2019Granted
- 20476A 10 YEAR PERMISSION FOR DEVELOPMENT WHICH CONSISTS OF THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION / 0.6 km away / 16 February 2021Granted
- 19100ALTERATIONS TO EXISTING OFFICE/RETAIL BUILDING AT GROUND & FIRST FLOOR LEVEL AND ALTERATIONS TO EXISTING ELEVATIONS, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.7 km away / 05 June 2019Granted
- 1937CONSTRUCTION OF A TWO STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING, INTERNAL ALTERATIONS TO ROOMS AT GROUND & FIRST FLOOR LEVEL, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.7 km away / 10 July 2019Granted
- 2129CONSTRUCTION OF A SINGLE STOREY DWELLING, SINGLE STOREY DOMESTIC GARAGE, BORED WELL, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS / 0.7 km away / 22 July 2021Granted
- 183721) EXISTING SITE WORKS COMPRISING OF, A NEW VEHICULAR ENTRANCE OFF THE L003 PUBLIC ROAD, A NEW STAFF CAR-PARKING AREA, A NEW LORRY PARKING AREA AND ASSOCIATED SITE ROADWAYS IN SO FAR AS THEY ARE COMPLETE. PERMISSION IS ALSO SOUGHT TO COMPLETE SAME. 2) PERMISSION IS SOUGHT TO CONSTRUCT A NEW WEIGHBRIDGE. 3) PERMISSION FOR EXTENSIONS TO THE NORTH-WEST AND NORTH-EAST OF EXISTING BUILDINGS TO COMPRISE GRAIN INTAKE BUILDINGS AND TRUCK LOADING AND PALLET STORAGE BUILDING / 0.8 km away / 19 March 2019Granted