Cleen, Knockvicar, Boyle
Planning application 18293
DecisionConditional grant
Decided24 September 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Roscommon County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Roscommon has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cleen, Knockvicar, Boyle?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17398For the replacement and enlargement of existing sunroom: minor alterations to the exterior & interior; all associated site works at / 0.7 km away / 03 November 2017Granted
- 18489Planning permission to provide single storey extension to the rear and side of existing dwelling and carry out associated alterations to the dwelling together with all associated site works at / 0.7 km away / 16 November 2018Granted
- 2560508Permission for the construction of an agricultural building / slatted house (area 297 sq./mtrs. approx.) incorporating feed passage, concrete apron and effluent storage tank (area 276 cub. mtrs. approx.) at / 1.2 km away / 03 February 2026Granted
- 18271Planning permission for (1) To Retain access road as constructed; (2) To Retain office/studio; (3) To Retain log cabin and Planning Permission to relocate septic tank onto enclosed site and the construction of a proprietary treatment unit, to construct a front porch and to alter and extend window to front façade at / 1.3 km away / 08 August 2018Granted
- 2177To retain the following - 1) Wastewater treatment plant and sand polishing filter; 2) Extension to rear of building which comprises a lobby and wheelchair WC at / 1.6 km away / 01 April 2021Granted
- 1782To construct an extension to the kitchen at "The Moorings"; / 1.6 km away / 19 April 2017Granted
- 21543Retention Permission for a Polydome shelter, a Nissen Hut and a single bedroom garden pod with connection to existing on site services and PERMISSION for the demolition of the entrance porch on the front (south) side of the house and construction of two single storey extensions on the front (south) side of the house, provision of canopies over the external doors on the south east and north sides of the house, alterations to the window and door openings on the north elevation of the house, installation of an external insulation system to the exterior of the house, decommissioning of the existing on site wastewater treatment system and installation of a new proprietary wastewater treatment system with discharge to a packaged tertiary unit and a distribution attenuation layer and ancillary site works at / 1.6 km away / 22 November 2021Granted
- 225431. Retention Permission to retain existing storm shelter barrier bounding an existing open winter boat storage area, retain, complete and continuance of use of small inner harbour on South West side of site; 2. Permission to construct a covered winter boat storage shed incorporating the storm shelter barrier into the North West elevation of the proposed covered winter boat storage shed, provide 2 No. over ground rainwater harvesting storage tanks and all ancillary site works necessary to complete the development at / 1.6 km away / 19 October 2023Granted