Derrane and Roxborough, Co. Roscommon
Planning application 18447
DecisionRefused
Decided15 January 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Roscommon County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Roscommon has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Derrane and Roxborough, Co. Roscommon?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22363Permission for: (A) amendments to (i) extant planning permission PD/18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD/11/126 and PD/18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD/18/313; (B) Permission for the development of a battery storage unit and a transformer unit. The amendments in (A) above will provide for: 1. Erection of two Enercon E138 turbine models in lieu of the Vensys 121 turbine models agreed with the Planning Authority, under condition 4(a) of planning permission ABP-3037726-19. Turbine T1 will have a hub height of 95.53m, a blade diameter of 138m and a blade tip height of 164.65m. Turbine T2 will have a hub height of 81m and blade diameter of 138m and a blade tip height of 150m. The combined output from the turbines will be 4.9MW; 2. Relocation of the access road serving the development, as previously permitted under planning permissions PD/11/126, PD/18/313, ABP-303677-19 and ABP-307726-20; 3. The relocation of underground electrical cabling to the relocated access road referred to under paragraph 2 above and additional underground electrical cabling to serve the proposed modular windfarm control and switch rooms, the ESB modular MV station, referred to in paragraph 6 below and the new battery storage and transformer units referred to in (B) above; 4. Increase in the hub height of turbine T1 to 95.53m, increasing the blade tip height from 150m to 164.65m and micro-siting of turbine T1 by 12.75m; 5. Increase in the area of the hardstands associated with each turbine; 6. Amended substation structure to incorporate a proposed modular windfarm control and switch rooms and an ESB modular MV station; 7. Revised site boundaries at / 0.0 km away / 05 September 2022Refused
- 2360198Permission for amendments to (i) extant planning permission PD18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD11/126 and PD18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD18/313. The output from the development will be 4.9MW, similar to the extant planning permissions. The amendments will provide for 1. Erection of two bespoke Enercon E138 turbines models in lieu of the Vensys 121 turbine models agreed with the Planning Authority, under condition 4(a) of planning permission ABP-3037726-19. Turbine T1 will have a hub height of 99m, a blade diameter of 138m and a blade tip height of 168m.Turbine T2 will have a hub height of 81m, a blade diameter of 138m and a blade tip height of 150m. The maximum combined output from the turbines will be 4.9MW. 2. Relocation of the access road serving the development, as permitted under planning permissions PD11/126, PD18/313, ABP-303677-19 and ABP-307726-20. 3. The relocation of underground electrical cabling to the relocated access road referred to under paragraph 2 above and additional underground electrical cabling to the proposed modular windfarm control room/switch room and ESB modular MV station referred to in paragraph 6 below. 4. Increase in the hub height of turbine T1 to 99m, increasing the blade tip height from 150m to 168m and micro-siting of turbine T1 by 12.75m. 5. Increase in the area of the hardstands associated with each turbine. 6. Amended substation structure to incorporate a proposed modular windfarm control/switch rooms and an ESB modular MV station. 7. Revised site boundaries at / 0.0 km away / 03 January 2024Refused
- 21690Permission for development consisting of: The construction of a new three storey building containing furniture showrooms, offices and storage; Connection to exising utility services; New carpark layout; Boundary alterations as per planning reference PD/20/548 and all associated site development works at / 2.5 km away / 11 February 2022Refused
- 1961For retention of garage which will be used for fuel storage/general storage, associated site works and services at / 2.8 km away / 02 April 2019Refused
- 19416Retention of garage which will be used for fuel storage/general storage, associated site works and services at / 2.8 km away / 01 October 2019Refused
- 19575Permission to construct dwelling house with domestic garage, connection to services and carry out all ancillary site works at / 2.8 km away / 03 January 2020Refused
- 2460144Permission for development consisting of construction of single storey dwelling house with effluent treatment unit, domestic garage & access drive with associated site works at / 2.9 km away / 20 May 2024Refused
- 17470To construct 6 No. semi-detached and 1 No. detached two storey dwellings, associated site development works on sites 32 to 35 at / 2.9 km away / 23 January 2018Refused