Ballinaboy, Roscommon, Co. Roscommon
Planning application 202
DecisionConditional grant
Decided28 July 2020
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Roscommon County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Roscommon has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballinaboy, Roscommon, Co. Roscommon?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20118For retention of dwelling to include unauthorised elements which are different to that granted planning permission under P&D Ref 00/1389 at / 0.0 km away / 30 June 2020Granted
- 21257Permission to construct slatted shed together with all associated site works at / 0.6 km away / 09 July 2021Granted
- 19631Permission to construct a 24m multi-user lattice tower carrying telecommunications equipment, together with associated equipment and cabinets enclosed within a 2.4m palisade fence compound, including new access track together with associated ground equipment and associated site works at / 0.9 km away / 07 February 2020Granted
- 22486Permission for development consisting of: (i) The demolition of an existing single storey extension to the rear of the existing house; (ii) General renovation and upgrade works to the existing house (90m2); (iii) The construction of a new single-storey extension to the front of the house (55m2); (iv) The construction of a stand-alone studio space to the front of the house (33m2) and (v) All associated drainage, landscaping and site works at / 0.9 km away / 02 March 2023Granted
- 20503For extension and refurbishment works to existing dwelling at / 1.2 km away / 28 January 2021Granted
- 2560481Permission for the following: 1. To refurbish derelict house to include alterations to elevations and removal of both chimneys, 2. To construct new rear extension to same, 3. To install upgraded treatment system and percolation area, 4. To demolish existing derelict shed, 5. To construct a domestic shed to the rear, 6. To define boundary and to add new boundary wall to sides and post and rail fence to the rear, to define the garden space associated with the dwelling, and carry out all ancillary site development works at / 1.4 km away / 02 December 2025Granted
- 2460369Retention Permission & Permission for development as follows: Retention for an existing machinery storage outbuilding and for the increased floor area and design of an existing stable and storage building as previously approved ref: PD/03/1512, with permission for the demolition of an existing single storey bay window to the east, the utility, carport and outbuilding to the south, removal of a chimney, adjustments to existing windows and door opes to both west and east, and the construction of single storey extensions to the east, west and south, including internal modifications, and permission for the decommissioning of the existing septic tank and the proposal of a new proprietary wastewater treatment system and all associated site works at / 1.4 km away / 12 December 2024Granted
- 22138Permission for the following: 1. Demolish existing dwelling house; 2. Construct new replacement house and domestic garage; 3. Upgrade existing treatment system with new proprietary treatment system and percolation area; 4. Relocation of site entrance, along with boundary treatments, and all associated ancillary site development works at / 1.5 km away / 04 May 2022Granted