Barrymore Townland, Hodson Bay, Kiltoom Athlone
Planning application 2262
DecisionConditional grant
Decided24 January 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Roscommon County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Roscommon has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Barrymore Townland, Hodson Bay, Kiltoom Athlone?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360194Permission for the construction of a new two storey dwelling (280 sqm) and associated ancillary works to facilitate the development including site development works, parking, drainage, foul connection to the mains drainage and landscaping at / 0.8 km away / 13 May 2024Granted
- 20571To demolish semi derelict dwelling and construct replacement part two storey and part single storey dwelling, domestic garage and connect to existing public sewer and water services on site, associated site development works and services at / 0.9 km away / 23 February 2021Granted
- 23298Permission to construct a detached dwelling house and garage on site no. 5 (Phase 2). (Note: development access entrance/exit onto the public road, ancillary landscaping and footpaths along with connection to public services and sewers including all associated site development works previously granted under PD/21/233) at / 1.0 km away / 21 March 2024Granted
- 21233Permission to: (a) construct a development access road incorporating entrance / exit onto the public road, ancillary landscaping, and footpaths along with connection to public services and sewers including associated site development works and (b) construct 4 No. detached dwelling houses and garages at / 1.0 km away / 05 July 2021Granted
- 2360292Permission for development consisting of: 1) The construction of new front and rear extensions with internal and external alterations to an existing single storey private dwelling; 2) the provision of a new ancillary detached garage to the rear; 3) the addition of a prefabricated cabin to serve as an ancillary accommodation to the main house; enhancements to the existing vehicular entrance and all associated site development works at / 1.0 km away / 23 February 2024Granted
- 21239Retention permission for development consisting of the following: Retention of a single storey extension to the south elevation of existing dwelling and all associated works at / 1.0 km away / 05 July 2021Granted
- 2360204Permission for development consisting of: a) Conservation and protection of all existing woodland areas and the natural environment as a fundamental objective of the development, b) Regeneration of the former woodland areas towards the centre of the Yew Point peninsula, now largely depleted following generations of agricultural activity, with the extensive planting of native tree species of Irish provenance, c) Construction of 36 no. timber eco-cabins providing 12 no. family cabins and 24 no. two-person cabins raised on stilts above ground levels, to conserve existing ground conditions and preserve through routes for movement of wildlife. The cabins arranged in five clusters confined to the southern portion of the lands, carefully respond to their specific site context, respecting existing woodlands and topographical conditions, d) Provision of 4 no. timber guest shelters distributed across the site, and a covered shelter to facilitate the charging and storing of electric golf buggies, e) Extension and refurbishment of the existing building/shop, with minor internal reconfigurations and the upgrading of the exterior with slatted timber screens, new doors and windows and a covered deck area, f) Construction of an Environmental Induction Area to facilitate the immersion of guests in environmental topics and the principles of fully sustainable living, and inform them, specifically, on the ecology and biodiversity of the Yew Point/Lough Ree area, g) All cabins and other new structures are designed to minimise environmental impact and disruption through the off-site fabrication of the main components, careful siting and reversible forms of construction. Materials of low embedded carbon are to be used and operational carbon is minimised through the use of renewable sources of energy. Surface water run-off is dealt with by strategically located Rain Gardens to filter and slowly release rainwater into the ground, h) Sustainable energy sources with the use of renewable solar photovoltaic panels as the primary source of energy generation for the entire development, i) Provision of slatted timber entrance gate structure to provide vehicular access and a covered pedestrian entrance with related signage, j) Construction of 1 no. reinforced "Grass-crete" surfaced car park at the existing site entrance providing 48 no. car parking spaces in total (1 no. car parking space per cabin and 12 no. staff car parking spaces). The car parking provision includes 10 no. EV charg / 1.1 km away / 12 January 2024Granted
- 2560020Permission for minor amendments to the sustainable eco-tourism project previously approved under Planning Ref. No. PD/23/60204. The development, situated on a 59.71-hectare (147.55-acre) site, is a low-density visitor destination designed with minimal environmental impact, utilizing renewable energy, sustainable materials, and reversible construction methods. The proposed amendments are: a. minor relocation southward by c.7 metres of the permitted Environmental Induction Building with bicycle parking (8 spaces) relocated adjacent to the building, b. A small increase in the building’s floor area (from the permitted area of c.111 sq.m. to c.142 sq.m.), to include a café/restaurant (c.107 sq.m.) area, kitchen (c.28 sq.m.) and storage (c.6 sq.m.) to serve guests and staff only, enhancing the environmental education experience, with associated amendments to the building’s elevations. c. The addition of an external covered walkway (c.86 sq.m.) connecting the Environmental Induction Building as amended to the existing WC/shower facilities building. The application is supported by an addendum Natura Impact Statement (NIS) to the original NIS submitted under Ref. No. PD/23/60204 at / 1.1 km away / 13 March 2025Granted