Cartron, Carrick-on-Shannon, Co. Roscommon
Planning application 2560470
DecisionConditional grant
Decided19 March 2026
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Roscommon County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Roscommon has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cartron, Carrick-on-Shannon, Co. Roscommon?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 1788To construct dormer extension to side of existing dormer dwelling, minor alteration to existing rear elevation and associated works at / 1.0 km away / 04 July 2017Granted
- 19396For the construction of a 36 metre high free standing lattice communication structure and its associated antennae, communication dishes and ground equipment within a 2.4 m high palisade fence compound at ESB's existing Flagford 220kV substation at / 1.1 km away / 07 April 2021Granted
- 187The application site is c.3.0 hectares. Permission is sought for a battery energy storage facility which will comprise of rechargeable battery units contained within up to 31 No. 40 foot containers on site and the associated development of unit substations, a 110 kV substation, security fencing, security cameras, lighting mast, new site roads and new vehicular access. The facility will connect into the adjoining Flagford ESB Substation via underground cable. All associated site development, landscaping and boundary treatment works above and below ground. Permission for development within the townland of / 1.2 km away / 01 June 2018Granted
- 1893For a single storey sunroom extension to side of existing two storey dwelling, conversion of attached garage to living accommodation with minor alteration to front elevation and detached domestic garage at / 1.3 km away / 12 April 2018Granted
- 2579Retention Permission to retain dwelling house, domestic garage as constructed and re-location of entrance from that granted under Planning Permission Ref. No. 04/1934 and all associated works at / 1.5 km away / 06 January 2026Granted
- 2397Planning Permission to re-construct and extend dwelling house and all associated works at / 1.5 km away / 23 August 2023Granted
- 19131To erect a dwelling house and domestic garage and construct a septic tank system and percolation area and all associated site works at / 1.5 km away / 02 May 2019Granted
- 20191The development will consist of 1) the proposed demolition of the existing single storey annex to the East & front entrance porch to the West of the existing detached dwelling; 2) the proposed construction of a new single storey extension to the East of the existing detached dwelling; 3) the proposed construction of a detached Garage; and 4) associated site works & services at Killukin Townland, Carrick-on-Shannon, Co. Roscommon. / 1.7 km away / 18 September 2020Granted