Carrowcashel Tullynure Glen Straduff, and Ballynashee, Sligo
Planning application 1864
DecisionRefused
Decided10 August 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Carrowcashel Tullynure Glen Straduff, and Ballynashee, Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18397The installation of approximately 0.38km of underground cable ducting and ancillary development laid within private lands within the townland of Gubbarudda. Permission is also sought for the installation of the electricity cable following completion of the civil works. (This application is accompanied by an Environmental Impact Assessment Report (EIAR) / Environmental Impact Statement (EIS)) / 2.5 km away / 02 October 2018Refused
- 18102The development will consist of the laying of underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm within the townlands of Derrysallagh and Glen, County Sligo (Sligo County Council Planning Reference PL12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of this development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP-300811-18). The proposed development within the jurisdiction of Co. Roscommon for which permission is sought includes the following: Installation of approximately 0.38km of underground cable ducting and ancillary development laid within private lands within the townland of Gubbarudda. Permission is also sought for the installation of the electricity cable following completion of the civil works. This application is accompanied by an Environmental Impact Assessment Report (EIAR) /Environmental Impact Statement at / 2.5 km away / 01 May 2018Refused
- 2560402Permission for development which will consist of: Demolition of the existing single-storey front porch and rear extensions and construction of new single-storey pitched-roof extensions to the side, and rear of the existing dwelling, linked via two single-storey flat-roof corridors. Provision of a single-storey flat-roof front porch extension with a relocated front door. Construction of a new storage shed along the southwestern boundary of the site for the storage of farm machinery and other equipment at / 2.7 km away / 06 May 2026Refused
- 1845For the installation of approximately 0.46km of underground cable ducting, 1 no. joint bay and ancillary development laid primarily within the public road corridor, with a section of circa. 0.07km within private lands at Seltan. A Section of ducting is to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townland of Boleymaguire, Co. Leitrim. Within the townland of Boleymaguire, permission is sought for the carrying out of remedial works to approximately 0.44km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanála (Ref: ABP-300811-18), remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following the completion of the civil works. The development will comprise part of an overall development in Counties Leitrim, Sligo and Roscommon, consisting of the laying of an underground 38 kv electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm, Co Sligo (Sligo County Council planning reference: PL 12/133) to the national electricity grid via the existing Garvagh 110kv substation in the townland of Seltan, Co Leitrim. Part of this development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (ref: ABP-300811-18). This application is accompanied by an Environmental Impact Assessment Report (EIAR)/Environmental Impact Statement (EIS). / 3.3 km away / 08 May 2018Refused
- 21140To erect a 20m high lattice telecommunications support structure together with antennas, dishes and associated equipment all enclosed in security fencing at / 4.4 km away / 01 April 2022Refused
- 2560313Permission for development consisting of the construction of a dwelling house, domestic garage, entrance, wastewater treatment system and polishing filter together with all ancillary site works and services at / 4.6 km away / 22 August 2025Refused
- 21689Permission: 1.To construct 2 no. two storey type domestic dwellings; 2. To construct two new site entrances; 3. To connect to the public services and all ancillary works at / 4.7 km away / 11 August 2022Refused
- 2460008Ten year planning permission with a 40-year operational life (from the date of commissioning of the development). (ii) Construction of 4 No. wind turbines with an overall ground to blade tip height ranging from 149.85m to 150m inclusive. The wind turbines will have a rotor diameter ranging from 115.7m to 117m inclusive and a hub height ranging from 91.5m to 92m inclusive. (iii) Construction of permanent turbine hardstands and turbine foundations. (iv) Construction of a bottomless bridge culvert across a minor stream on site (EPA River Segment Code: 26_4053). (v) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. (vi) Installation of one (40-year life cycle) meteorological mast with a height of 50m and a 4m lightning pole on top. (vii) Construction of new internal site access tracks and upgrade of a section of existing internal Site track, to include all associated drainage. (viii) Improvement of existing site entrance with access via the L4282. (ix) Development of an internal site drainage network and sediment control systems. (x) Construction of 1 no. permanent 20kV electrical substation. (xi) All associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation. (xii) All works associated with the connection of the wind farm to the national electricity grid, which will be via 20kV underground and partially overhead cable connection approximately 6.4km in length to the existing ESB Corderry 110kV Substation in the townlands of Letter, Greaghnadarragh, Stangaun, Corralustia, Turpaun, Gortnasillagh West, Lugmeeltan, Leckaun, Lisgavneen, Treannadullagh, Drumcashlagh and Corderry. (xiii) Ancillary forestry felling to facilitate construction of the development. (xiv) All associated site development works including berms, landscaping, and soil excavation. (xv) Installation of battery arrays located within container units (2 no. units) and associated electrical plant for grid stabilisation adjacent to the substation building. (xvi) Development of one on-site borrow pit. / 5.9 km away / 13 March 2024Refused