Riverstown Td, Gurteen, Co. Sligo
Planning application 19411
DecisionConditional grant
Decided14 January 2020
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Riverstown Td, Gurteen, Co. Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560256Construction of a new bungalow type dwelling. Construction of a new wastewater treatment plant and percolation area in accordance with EPA Code of Practice. Construction of a new vehicular entrance and access road to serve dwelling. All associated site development works / 0.1 km away / 09 September 2025Granted
- 2460313(1) a new effluent treatment system and percolation area (2) to retain revised site boundaries (3) to retain existing garage (4) to retain existing domestic shed (5) to retain existing windows in gables of existing house (6) and all associated site works / 0.4 km away / 17 December 2024Granted
- 1753Development consisting of the construction of a new single storey extension to the side and rear of existing dwelling house and all associated site works / 1.0 km away / 11 April 2017Granted
- 2360288Planning permission for a renewable wind energy development of a one (1) turbine wind farm. The proposed development will be located in the townland of Riverstown, approximately 2.2km north of Gorteen, Co. Sligo. The development will comprise of one (1) electricity generating wind turbine, which will have an overall maximum tip height of 180 meters, comprising a tower of nominally 112 meters high, and rotor diameter of up to 136 meters. The development will consist of permanent access tracks, hardstandings, an electrical substation building, an underground cable trench and ancillary site works. The maximum output capacity of the wind farm will be c.3.5mw. / 1.0 km away / 04 July 2024Granted
- 20172Development consisting of (1) to revise the location of the proposed new silage slab and associated wing walls (2) revise the site boundaries all as previously granted under PL16/137, and all associated site works / 1.1 km away / 17 July 2020Granted
- 2660150(1) the construction of a new slatted shed including new underground storage tanks (2) and all associated site works / 1.1 km away / 08 July 2026Granted
- 2660175Construct a new slatted shed and silage base together with all ancillary site works and services. / 1.5 km away / 25 June 2026Granted
- 18225For development consisting of the refurbishment of an existing 2 storey, 5 bedroom house to provide improved disabled facilities at ground floor level only. Proposed works to include 1 no. single storey, pitched roof extension (circa 19 sq.m) to Eastern elevation with 2 no. rooflights to rear pitch, replacement of 1 no. ground floor window to western elevation with 2 no. windows to modified bedroom area and replacement of 1 no. window to Southern elevation with 1 no. double door to kitchen area, landscaping and all associated site works / 1.5 km away / 26 July 2018Granted