Glen, (E.D. Ballynashee), Co Sligo
Planning application 2120
DecisionConditional grant
Decided24 March 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Glen, (E.D. Ballynashee), Co Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20234For development consisting of retention of infrastructure. The elements are to be retained for the lifetime of the wind farm. The development consists of blade delivery trestles constructed at the turbine crane hardstands required for the set down and storage of turbine blades at each location, passing bays required for vehicles to pass each other on-site and upgrade and use of 154m of pre-existing tract between Turbines T9 and T10. The retention of these structures is required for continued maintenance of turbines on site. / 0.7 km away / 09 September 2020Granted
- 20456Retention Permission for access track c. 96m long, as entrance to Derrysallagh Wind Farm. Permission to construct 15m long stone clad concrete block walls at each side of entrance, construction of 7m wide barrier and signage at entrance, construction of double gates at exit from track at / 0.9 km away / 08 January 2021Granted
- 2028Development consisting of construction of a new forestry road entrance including all associated site works / 1.2 km away / 27 March 2020Granted
- 20178Development consisting of (i) retention of a meteorological mast, with an overall height of 31 metres, supported by guy wires for the purpose of measuring and recording meterological data, (ii) concrete mast foundation and anchors; (iii) approximately 40m of underground electricity and telecommunications cabling; and (iv) all associated site development and reinstatement works / 1.9 km away / 21 July 2020Granted
- 18186Retention Permission for the following development:- To retain as constructed single storey entrance porch to existing two storey dwelling house at / 2.5 km away / 13 June 2018Granted
- 1928For development consisting of the demolition of the existing derelict house and for the construction of a new dwelling house, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works / 2.8 km away / 13 May 2019Granted
- 23255Permission for the construction of sheep shed, roofed manure pit and ancillary works (i.e. concrete yards and farmyard access road - all for agricultural purposes only) in an extension to the existing farmyard area (within 100 meters) utilising the existing farm entrance at / 2.8 km away / 19 September 2023Granted
- 18435To construct a new forestry site entrance to an existing mature forest and all ancillary works / 2.8 km away / 16 October 2018Granted