Finisklin Business Park, Finisklin, Sligo
Planning application 2182
DecisionConditional grant
Decided06 May 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Finisklin Business Park, Finisklin, Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460293Development, located to the northeast of the existing facility, will consist of a new ESB substation and switch room to serve the existing facility. The substation measures 45.7m2 in plan area and 3.5m in height. The switchroom and a back up generator will be located on a raised gantry that will measure 121m2 and 7m in height and be situated 3.5m above ground level / 0.1 km away / 30 October 2024Granted
- 21364Development consisting of the proposed building extension comprising of an additional 267.08m2 of manufacturing space, the demolition of an existing substation and construction of a new relocated substation with an area of 22.49m2 including all other associated site ancillary works / 0.1 km away / 06 December 2021Granted
- 21392Development consisting of the construction of a new Waste holding facility comprising of the construction of 2No 50,000l liquid storage tanks, 390sqm of hard standing and a new internal access route including all other associated site ancillary works and landscaping / 0.1 km away / 23 November 2021Granted
- 22151Development consisting of a proposed two storey office building (gross floor area of 1774.4 m2), adjacent bike shelter (10.5 m2) and a car park comprising 224 parking spaces and all other associated site ancillary and infrastructure works including carpark lighting / 0.1 km away / 12 December 2022Granted
- 21471Development consisting of replacement of 2 no perimeter wall mounted flood lit signs with 2 no internally illuminated free standing podium signs on lands / 0.2 km away / 02 February 2022Granted
- 21473PP - development consisting of change of use from warehouse to offices and clean room, floor area 1,080 sq.m. in existing factory. The development will include alterations to the north elevation to provide glazing / 0.2 km away / 16 March 2022Granted
- 17271Development consisting of (a) provision of new ground floor offices, meeting rooms, clean rooms, washroom facilities, laboratory and warehouse accommodation. (b) Making of alterations to existing elevations, including change of external panel design to all elevations, new glazing design to East and North elevations, addition of two additional dock levelers, loading bay doors and pedestrian entrance doors to West elevation (c) Demolition of existing internal office space which includes ground and first floor accommodation to provide new accommodation. (d) Erection of a new site boundary fence to perimeter of site. (e) Provision of additional car parking spaces to existing car parking area, together with all ancillary site works and services / 0.2 km away / 06 September 2017Granted
- 2360155Alterations and extensions to the existing an post Sligo Delivery Service Unit building to include for a new single storey temporary structure (10m x 30m x 5.5m tall) and temporary connecting link corridor (5m x 5m. x 5.5m tall) both located to the rear (northern) elevation of the existing building. The proposed temporary building would be in place for a period of between 7 to 10 years and consists of a hard shell marquee type structure with a double skinned pvc material, fully tensioned roof and all associated site development works / 0.2 km away / 15 August 2023Granted