Cloonkeelaun townland, (adjacent to existing Carrowleagh and Black Lough wind farms), Co. Sligo
Planning application 22161
DecisionConditional grant
Decided20 September 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cloonkeelaun townland, (adjacent to existing Carrowleagh and Black Lough wind farms), Co. Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360359Development will consist of (i) the construction of a 30m-high free-standing lattice meteorological mast with underground cabling to the existing Black Lough Wind Farm control building; and (ii) all associated ancillary works / 0.4 km away / 14 February 2024Granted
- 19160For development consisting of an amendment to the permitted grid connection (Ref. No. PL16/422). The amended grid connection will be from the Black Lough Wind Farm at Tawnamore, Co. Sligo (Ref. No. PL17/93 to the permitted control building at Cloonkeelaun (Ref. No. PL 16/422), traversing the townlands of Tawnamore and Cloonkeelaun. The development will consist of a 20kv cable extending to (a) circa 2.3 kilometres of overhead line supported by a single wooden poles, (b) approximately 240m of underground cabling extending from turbine T2 at Black Lough to the first wooden pole and (c) approximately 100m of underground cabling from the southern-most pole of the proposed overhead line to the control building at Cloonkeelaun. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the planning authority at / 1.7 km away / 18 November 2019Granted
- 2360363Construction of a new slatted shed and underground slurry storage tank along with all associated site works / 1.7 km away / 16 February 2024Granted
- 22221RETAIN TEMPORARY METEOROLOGICAL MAST AND ASSOCIATED SITE WORKS THAT WILL OPERATE FOR A FURTHER 2 YEARS. THE METEOROLOGICAL MAST WILL RETAIN ITS FINISHED HEIGHT NOT EXCEEDING 80M ABOVE EXISTING GROUND LEVEL CONSISTING OF A LATTICE TUBULAR FRAME, GUY WIRES AND ANCILLARY EQUIPMENT / 2.1 km away / 11 May 2022Granted
- 1898PP - for development consisting of (1) demolition of existing derelict dwelling house (2) construction of a replacement dormer dwelling house (3) construction of a septic tank and percolation area (4) bore a domestic well (5) new vehicular entrance (6) carry out all ancillary site works / 2.2 km away / 25 June 2018Granted
- 1793A ten year permission for development consisting of: (a) erection of four wind turbines with blade tip height of 124.33m (78.33m hub height, 92m rotor diameter) (b) cranage and assembly hardstand areas adjacent to each turbine (c) control room and parking spaces (d) cabling between each turbine (e) widening of existing access road and provision of new sections of access road to serve wind turbines (f) stilling ponds (g) peat reinstatement areas (h) replacement bridge across Gowlan River and realignment of approaches to the bridge (i) use of existing borrow pit and (j) all associated ancillary infrastructure. An Environmental Impact Statement (EIS) and a Natura Impact Statement (NIS) have been submitted with the application. The proposed development is located / 2.9 km away / 03 May 2017Granted
- 20228For development consisting of amendment to planning permission PL17/93 for development of four wind turbines. The amendment application will consist of the removal of condition 7(c) of planning permission PL17/93, which provided for the removal of the crane hard standings following erection of the turbines. / 2.9 km away / 03 September 2020Granted
- 17293For development consisting of the construction of a dwelling house, domestic garage, proprietary effluent treatment system and percolation area, together with all associated site works / 3.0 km away / 18 September 2017Granted