Kiltycloghan, Balintogher, Co Sligo
Planning application 22192
DecisionConditional grant
Decided26 September 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Kiltycloghan, Balintogher, Co Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22312Development consisting of construction of a domestic shed/garage ancillary to an existing dwelling house / 0.1 km away / 14 November 2022Granted
- 21378Development consisting of retention of an existing domestic garage and all associated ancillary works, parent application No. 03/333. / 0.2 km away / 11 November 2021Granted
- 2360214A 10 year planning permission for the construction of a: 1. enclosed battery energy storage system compound on a total of up to c. 5.05 hectare site, to include: • 150 battery units set inside storage blocks on concrete support structures containing Heating, ventilation and air conditioning unit (HVAC units); • Transformer and inverter units on concrete support structures; • 1 no. two storey customer 220kV Gas Insulated Substation (GIS) (See Drawing 23553-201 and 23552-202); • 1No. Customer Control Building and 220kV Transformer with associated Switchgear; • 3No. Containing Back-up Generators, Auxiliary Transformers, Switchgear containers, LV and Control Containers; • 1No. Lightning Pole; • 2No. Firewater reservoir ponds with Pumping station and 1No. detention basin with associated drainage systems (as per Drawing 23553-102); • Security gates, 2.6m palisade perimeter security fencing, CCTV and lighting system, landscaping works and all associated ancillary infrastructure; • 4.5m wide Access tracks and site entrance along with upgrade works on the public site access road (c.950m), • Associated electrical cabling and ducting and all other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of areas of hard standing including a maintenance lay-down area. • c.100m of underground cabling ducts and cable to the neighbouring ESB substation. A Natura Impact Statement has been prepared for this proposed development to assess and mitigate any potential ecological impacts. the development will be located at a site in the townland of Ballysumaghan, Fannybrook, Quarry Lane Co. Sligo. The proposed development will have a projected life span of 35 years. / 0.8 km away / 10 October 2023Granted
- 2090Development consisting of a 10 year permission. The development will consist of the development and operation of a 250 to 300 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare and will consist of the following elements: A Condenser and Control Building to house equipment including the synchronous condenser, flywheel, lube oil skid system, air compressor and pumps. Equipment to be located outside the footprint of the Condenser and Control Building but within the fenced compound will include: Cooling equipment (c. 160 sq m., c.3m high); 6 No. modular containers to house electrical and control equipment (total area of c. 195 sqm., c. 5m high); A step-up transformer, auxillary transformer and electrical plant including an external circuit breaker; 1 No. firefighting water tank; A below ground oil interceptor and attenuation tank in lieu of the originally proposed above ground oil interceptor and collection pit. Underground cabling ducts and cable to the neighbouring ESB substation boundary fencing (c. 500m). Palisade security entrance gate, boundary fencing and CCTV; All other ancillary and miscellaneous site works including site clearance; demolition of an existing agricultural shed, site access, internal roads and development of areas of hard standing including a maintenance lay-down area. Following a direction under section 177T(5) of the Planning and Development Act 2000 (as amended), a Natura Impact Statement (NIS) will now accompany the planning application. / 0.9 km away / 18 January 2021Granted
- 2560170The development will consist of amendments to the permitted but not yet constructed Synchronous Compensator grid stabilisation facility granted under Planning Ref: PL22/352 (Parent Permission). The proposed amendments comprise: a) exclusion of the consented 220kv high voltage gas insulated switchgear (GIS) building and associated compound; and b) a reconfigured and extended high inertia synchronous compensator (HISC) compound containing the consented 1 no. HISC unit enclosed within a steel clad framed style structure (12.1m max height) and all previously consented supporting plant and equipment, additional HV electrical plant and equipment, and all associated and ancillary site works necessary to facilitate the development including: all necessary drainage systems, foundations works, various underground cables and ducts, equipment plinths, internal services roads, rainwater harvesting systems, welfare and office units, material storage containers, compound lighting and palisade gates and fencing, security lighting, CCTV, hardstanding areas and boundary security fence. The remaining elements of the development permitted under Parent Permission Planning Ref: PL22/352 remain unchanged - DEV CONTRIBUTIONS PAID BUT NO COMMEMENCEMENT NOTICE SUBMITTED ON THE BCMS 11/12/2025 / 0.9 km away / 19 June 2025Granted
- 22352Development consisting of (a) A High Inertia Synchronous Compensator (HISC) compound containing 1 No. HISC unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 7 No. electrical equipment containers (containing ancillary power supply products including static frequency converters, MV switchgear, exciters, LV distribution, control room); 4 No. external cooler units; main, auxiliary & start-up electrical transformers, generator circuit breakers, switchgear equipment, and 1 No. back up diesel generator and associated diesel storage tank; (b) A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6 high galvanised steel palisade fence; (c) A 220kV underground cable to the existing adjoining Eirgrid substation boundary; (d) New access road and entrance from the L5204; (e) All associated and ancillary site works necessary to facilitate the development including: all necessary drainage systems, foundations works for the above compounds, various underground cables and ducts, equipment plinths, internal services roads, rainwater harvesting systems, welfare and office units, 2 No. material storage containers, compound lighting and palisade gates and fencing, security lighting, CCTV, hardstanding areas and boundary security fence. Planning permission to construct the development is sought for a period for 10 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies the application. / 1.1 km away / 21 December 2022Granted
- 2560339Planning Permission to construct a Single storey dwelling house, Garage and domestic waste water treatment system on site, together with all ancillary site works and services at Lavally, Ballintogher, Co. Sligo. / 1.1 km away / 30 September 2025Granted
- 2185Development consisting of the erection of a 36m high lattice communication structure carrying antennae, dishes and ancillary equipment with all associated ground-mounted equipment within a 2.4m high palisade fenced compound within the wider Substation lands at; ESB's existing Sranagh 220kV Substation Site / 1.2 km away / 07 May 2021Granted