St. John's Hospital, Ballytivnan, Sligo
Planning application 2323
DecisionConditional grant
Decided02 August 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near St. John's Hospital, Ballytivnan, Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460178Construction of a one storey extension to the rear of an existing two storey residential institutional building; modifications to the site layout and car parking involving a reduction in car park spaces; and all associated site works / 0.1 km away / 04 July 2024Granted
- 2074Development consisting of a temporary classroom / 0.1 km away / 22 June 2020Granted
- 25603461. Construction of a single storey extension to the north side of the existing school building to contain a single classroom and 4 no. S.E.T. rooms. 2. Connection to existing services on site and all ancillary site works connected with the works mentioned above. / 0.1 km away / 30 October 2025Granted
- 20454Development consisting of (1) construction of first floor extension to south elevation (2) construction of 2 storey extension to east elevation to replace existing single storey extension all to existing terraced dwelling house / 0.2 km away / 25 February 2021Granted
- 22444Development consisting of installation of 320 no. photovoltaic (PV) panels on south facing pitched roofs of the existing hospital building and all associated works / 0.2 km away / 23 February 2023Granted
- 17174Development consisting of 2 no. single storey new building extensions with associated landscaping (the total gross floor area of the extensions will be 684m2)and which will be used for residential healthcare / 0.2 km away / 30 June 2017Granted
- 2360032Development consisting of (i) 400m2 of roof mounted Photovoltaic Panels, (ii) a new 2 tonne LPG storage tank and (iii) a new heat pump, together with all associated site works and services / 0.3 km away / 17 April 2023Granted
- 1889For development consisting of retention permission for roofs as constructed over extensions that differ from those permitted under PD 999 and PD 1487 and all associated site works / 0.3 km away / 10 May 2018Granted