Srananagh, Sooey, Sligo
Planning application 2460086
DecisionConditional grant
Decided02 May 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Sligo County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Sligo has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Srananagh, Sooey, Sligo?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560343Construction of a single-storey flat roof extension to the rear and side of the dwelling, including two rooflights; and a two-storey flat roof extension to the rear to accommodate an extended first-floor bathroom with a new rear-facing window / 0.0 km away / 02 October 2025Granted
- 18337For development consisting of extension and alterations to existing school a) Removal of temporary portacabin classroom to side (west) off site and relocation of storage shed and oil tank on site, b) Provision of extension to the front (south), to include a new classroom, office, store, assisted WC, Set Room and link corridor, (c) Provision of retaining walls external steps to the front (south), all associated site development works including connection to on-site services / 0.0 km away / 05 October 2018Granted
- 1847Development consisting of the construction of a new forest access road entrance / 0.7 km away / 09 April 2018Granted
- 21375Development consisting of upgrading treatment system at existing house by installing new waste water treatment system and Ter 3 Packaged Tertiary unit / 0.8 km away / 24 March 2022Granted
- 2460413To (a) retain rear extension to existing dwelling house (b) elevation changes to existing dwelling house (c) revision of site boundaries to that previously granted planning permission under reference number PL 21/375 (d) retain revised location of effluent treatment unit to that previously granted under reference number PL 21/375 together with all ancillary site works and services on site / 0.8 km away / 09 January 2025Granted
- 21242Development consisting of the following, To retain and complete an existing Agricultural entrance / 1.0 km away / 11 August 2021Granted
- 22351Development consisting of: The 10 year permission for the construction and operation of a synchronous condenser facility. The facility will be a fenced compound ca. 1.196ha in size. The development will have a 30 year operational lifetime and will consist of a synchronous condenser, which will include the following elements: generator and flywheel building (ca. 600 sq.m., ca. 12.5m high) to house the equipment including the generator, flywheel, lube oil skid, vacumn skid, TEWAC pump skid, reverse switch cubicle and star point cubicle; SFC start-up equipment room (ca. 43.650 sq.m., ca. 4.20m high); AC/DC room (ca. 81.480 sq.m., ca. 4.20m high); C&P room (ca. 70.685 sq.m., ca. 4.20m high); battery room (ca. 28.130 sq.m., ca. 4.20m high); storage room (ca. 49.200 sq.m., ca. 4.20m high); supporting components of plant within the compound that include: outdoor cooler (ca. 190.925 sq.m., ca. 2.660m high); start-up transformer & auxiliary transformer structure (ca. 68.265 sq.m., ca. 4.50m high; step-up transformer (ca. 170.985 sq.m., ca. 8.0m high) partially surrounded by a fire wall; and, generator circuit breaker (40.160 sq.m., ca.10m high). All other ancillary and miscellaneous site works including: six (6 No.) lightening masts - height of lightening masts will be determined by lightening protection study prior to commencement of construction; site clearance; site access; separation walls (ca. 8m high) to the south of the transformers; internal hardcore access track; and, development of areas of hard standing including a maintenance layout area. The development will be bound by 2.4m high perimeter fencing. The application is accompanied by a Natura Impact Statement (NIS) / 1.0 km away / 19 December 2022Granted
- 18230Development consisting of permission for the construction of a new forestry access entrance to an existing mature forestry and all ancillary works. / 1.1 km away / 08 August 2018Granted