S00A/0167: Alterations and extensions to their existing premises to include replacing and extending the original Warehouse by 90 sq. metres and increasing the eaves heights from 4.5 metres to 9.7 metres, together with a new facade and first floor extension of 24 sq. metres to the existing two-storey Office area, in addition to general internal mezzanine extensions to 70 sq. metes.
Hilary House, Cookstown Industrial Estate, Tallaght, Dublin 24.
DecisionGrant permission
Decided11 May 2000
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Hilary House, Cookstown Industrial Estate, Tallaght, Dublin 24.?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD14A/0075Erection of 4.19sq.m. sheet metal signage fixed to south, east and west face of existing 3.975m high 'totem' style concrete structure in south west corner of site; erection of 15.71sq.m. sheet metal signage fixed to existing 5.1m high 'goal post' style structure abutting south east (front) corner of existing building; erection of 18m long x 3m high (54sq.m.) pvc 'banner' style signage fixed to rear (north facing) wall of building; erection of new 1.25m x 1.25m x 3.975m high steel advertising structure in south east corner of site with associated 5.34sq.m. sheet metal signage fixed to south, east and west face of structure. / 0.0 km away / 09 June 2014Granted
- S00A/0800Erection of 15m lattice antennae support structure carrying GSM Telecommunications Equipment, associated equipment container and palisade fencing. / 0.0 km away / 06 September 2001Granted
- SD05A/0845Change of use of premises to waste management use. / 0.1 km away / 16 March 2006Granted
- S99A/0799Sub-division of existing single office/warehouse units, with car parking to front and side and alterations to front elevation to include new warehouse roller shutter door and modifications to existing entrance. / 0.1 km away / 22 December 1999Granted
- SD08A/0580The demolition of an existing office block with a floor area of 2200sq.m and the construction of a part 4 storey mixed use development with a total gross floor area of 4642.6sq.m made up of the following; 2 no. retail units at ground floor measuring 202.6sq.m, 3 no. office units at ground floor measuring 661.1sq.m, 5 no. office units measuring 2282.8sq.m spread between first, second and penthouse levels. The proposed development also includes the relocation of the existing vehicular access along Cookstown Estate Road and site landscaping to surface carpark & ancillary site works. / 0.1 km away / 14 January 2009Granted
- SD06A/0388ESB sub-station and switchroom in yard at the rear of existing premises. / 0.1 km away / 11 July 2006Granted
- SD21A/0006Change of use of 58.4sq.m of the front ground floor single storey part of Unit 1 from office/light industrial use to click-and-collect retail use and ancillary site works. / 0.1 km away / 16 March 2021Granted
- SD25A/0144WChange of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works. / 0.1 km away / 21 October 2025Granted