S01A/0340: Three bedroom 2-storey dormer bungalow.
12 Colberts Fort, Tallaght, Dublin 24.
DecisionGrant permission
Decided18 December 2001
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD06A/0493A two storey retail warehouse with a total gross floor area of 971.9 sqm to a total height of 6.75 meters and the provision of 25 new car spaces, relocation of 41 existing car spaces associated site works & landscaping all on a site of approximately 0.4662 hectares. / 0.0 km away / 09 August 2006Granted
- SD24A/108WDemolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access. / 0.0 km away / 04 September 2024Granted
- SD23A/00523 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services. / 0.0 km away / 04 July 2023Granted
- S01A/0162Attached 3 bed dormer bungalow to side / 0.0 km away / 17 September 2001Granted
- SD25A/0013WSource EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works. / 0.0 km away / 21 March 2025Granted
- SD17A/0439Construction of a cafe/restaurant unit with an overall height of 4.05m and a total GFA of 175sq.m to be located in the central section of the car park of Belgard Retail Park. The proposal includes signage for the unit, associated outdoor seating area, bin store, landscaping and all associated site works. The development proposes the removal of 40 existing car parking spaces and provision of 8 new car parking spaces to the south of the proposed cafe/restaurant unit. It is also proposed to provide a 2m wide footpath from the proposed cafe/restaurant unit to the retail warehouse units. / 0.1 km away / 09 February 2018Granted
- SD03A/0063Detached dormer house and new driveway. / 0.1 km away / 27 March 2003Granted
- SD17A/0209Construction of a retail warehouse unit with an overall height of 8.6m and a total GFA of 2,404 sq.m. to be located adjacent to Unit 7 in the northwest of Belgard Retail Park. This includes 1,409 sq.m. of retail warehouse floorspace at ground floor level and 995 sq.m. of retail warehouse/storage space at mezzanine level. The proposal includes signage for the unit and a service area to the rear. The development will also involve the demolition of the existing 16 sq.m. single storey access building to the below ground pumphouse room located beside the sprinkler tanks (to be retained) and its replacement with a new standalone above ground pumphouse along the eastern boundary of the site measuring 22sq.m. The proposal will result in the removal of 82 existing public and staff car parking spaces, the repositioning of 10 car parking spaces repositioned to the eastern boundary and the provision of 11 new car parking spaces located at the northern boundary to the rear of the proposed unit. The proposal includes cycle parking, landscaping and all associated site works. / 0.1 km away / 04 December 2017Granted