S99B/0456: Single storey extension to kitchen and dining room at rear, with utility and toilet to rear of garage.
23 Ballyroan Road, Templeogue, Dublin 16.
DecisionGrant permission
Decided08 September 1999
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD05B/0695Single storey extension to rear of existing house / 0.0 km away / 19 December 2005Granted
- S00B/0700New bedroom extension at first floor over garage and single storey rear extension and retention of attic playroom. / 0.0 km away / 18 January 2001Granted
- SD06B/0333Single storey extension to the rear/side, two storey extension to side, conversion of garage with new pitched roof with roof light and bay window extension to front, conversion of attic to store/playroom with velux roof lights to rear. / 0.1 km away / 04 July 2006Granted
- SD11B/0013Amendments to previously approved planning application, Reg. Ref. SD10B/0243, to include the addition of rooflights on east and west main roof slopes; the increase in height of the existing window on the south gable wall; an additional rooflight to be provided over ground floor w.c; existing render finish on external wall to be removed and replaced with nap render finish; revised roof design over covered entrance, garage, utility room and w.c. on ground floor. / 0.1 km away / 09 March 2011Granted
- SD10B/0243An extension to side and rear of existing dwelling (34sq.m.) with an attic conversion (32sq.m.) and the construction of a refurbished porch and main entrance on the front elevation. Other works include the construction of a dormer window on rear roof pitch, alterations to 1st floor windows to rear, increase in height of narrow window to south elevation, widening of driveway and new roof finishes. / 0.1 km away / 16 September 2010Granted
- SD20B/0468Amendments to the front elevation of the existing dwelling and the construction of a first floor extension to the side of the existing dwelling comprising new bedroom and reading room with balcony over a new single storey extension to the rear comprising new dining area. Permission is also sought for the conversion of the existing attic space to accommodate new office space with new dormer window to the rear and roof lights to the front along with the widening of the access route to accommodate vehicular access along with dishing of the existing kerb to Ballyroan Road and all other associated ancillary site development works. Retention permission is sought for the widening of the existing vehicular entrance piers to 3.25m previously completed. / 0.1 km away / 04 February 2021Granted
- SD25B/0509WThe development will consist of new works, retention of completed works and other associated ancillary works consisting of: (1) Retention Permission sought for removal of chimney stack to rear roof pitch and making good local roof finish. (2) Retention Permission sought for removal of existing garage doors and replacement with new matching brick wall and window. (3) Permission sought for construction of new rear dormer structure to include selected grey membrane finish and matching grey windows / 0.1 km away / 16 October 2025Granted
- SD14B/0262Construction of a first floor extension to the side; a single storey extension to the rear; conversion of the existing attic space to a study and storage along with dormer window to the rear of the existing dwelling; refurbishment of the internal layout; amendments to the front facade including new bay window; widening of the existing entrance gate and the dishing of existing kerb to provide wider vehicular access; construction of a storage shed to the rear of the site and all ancillary site development works. / 0.1 km away / 18 December 2014Granted