SD02A/0404: To relocate the existing 11m2 prefabricated resource building to the western end of the existing prefabricated buildings and to construct a new 40m2 prefabricated building, for resource teaching use, on the eastern end of the existing prefabricated buildings.
St. Pius X National School, Fortfield Park, Terenure, Dub 6w
DecisionGrant permission
Decided05 September 2002
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near St. Pius X National School, Fortfield Park, Terenure, Dub 6w?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD04A/0317New entrance gates and side railings. The gates and railings will be moved forward from the existing position to align with the front facade of the adjoining neighbourhood shops and the works will involve the reconstruction of 6m of the side wall to 40 Fortfield Park to a height of 2.3m. / 0.0 km away / 30 June 2004Granted
- SD05A/0160New entrance gates and side railings at St. Pius X Boys & Girls National Schools. The gates will be moved forward from the existing position to align with the front facade of the adjoining neighbourhood shops. The railings will extend opproximately 13.5m in a southerly direction. / 0.0 km away / 27 April 2005Granted
- S01A/0081Erection of a prefabricated classroom and toilet facilities. / 0.0 km away / 09 April 2001Granted
- SD11A/0267Provision of a new entrance/exit lobby under the existing canopy; construction of a new accessible ramp and assocaited site works. / 0.0 km away / 11 January 2012Granted
- SD05A/0715Removal of existing single storey temporary accommodation and the construction of new replacement single storey teaching accommodation with ancillary and enabling works to the front yard area of the school grounds. / 0.0 km away / 13 October 2005Granted
- SD14A/0204Construction of a 15sq.m single storey flat roofed universal access toilet with ancillary and enabling works within an existing internal courtyard. / 0.0 km away / 17 November 2014Granted
- SD08A/0225New three classroom single storey school building of 250sq.m. with ancillary and enabling works to the rear side yard area of the school grounds. / 0.0 km away / 28 May 2008Granted
- S00A/0474Erect a pre-fabricated classroom and toilet facilities. / 0.0 km away / 24 August 2000Granted