SD04A/0614: The development will consist of the following works: construction of two storey extensions to the front of the existing buildings, remodelling of existing front and rear facades, provision of attached canopies, provision of attached illuminated signage, remodelling of existing parking areas, associated drainage and ancillary works.
Unit 83, Cherry Orchard Industrial Estate, Dublin 10
DecisionGrant permission
Decided04 October 2004
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD21A/0257Construction of extension to existing warehouse premises; erection of 2.4m high palisade fencing including entrance gates to front boundary. / 0.1 km away / 09 August 2022Granted
- SD06A/0964For the erection of 2.2m high steel security palisade fence around the full perimeter of the site and the forming of a new loading bay door opening with steel roller shutter door to the side elevation. / 0.1 km away / 09 January 2007Granted
- SD18B/0295Two storey extension to the side of the existing dwelling to accommodate living area, dining room study and an additional bedroom with an en-suite. / 0.1 km away / 12 November 2018Granted
- SD04B/0422Demolish existing single storey garage to side and construct single storey granny flat, comprising lounge - dining room, kitchen, bedroom, ensuite to side and bay window with canopy to front of existing house and all associaced works. / 0.1 km away / 25 November 2004Granted
- SD25B/0149WConversion of existing attic space to non-habitable storage/office area with new revised roof profile (from half hipped roof to gable end roof) to both sides of roof, New Dormer Type Window to Rear, 2 rooflights to front elevation, with internal modification and associated site works / 0.1 km away / 12 May 2025Granted
- SD11B/0154(1) Proposed lifting of existing Dutch Hip and extension of existing roof to gable wall; (2) construction of a dormer window to rear with attic conversion and 2 no. Velux windows to front. / 0.1 km away / 10 June 2011Granted
- S99A/0519Extensions and alteration to existing Production Premises at 57-59 Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10. This shall include an extension of 600m2 for delivery and goods store, silo for wood dust storage, modification of existing single storey offices to two storey structure incorporating an additional 640m2 of office and showrooom accomodation, refurbishment of facing cladding to existing structures and upgrading of parking, marshalling and landscaped areas including additional screen walls and railings to rear of site. / 0.1 km away / 27 September 1999Granted
- SD05A/0355Palisade fence to enclose the boundary to the eircom site adjacent to Kennelsfort Road. / 0.1 km away / 26 January 2006Granted