Site 24, Magna Business Park, Fortunestown, Jobstown and Gibbons Townlands, Tallaght, Dublin 24.
Planning application SD05A/0219
DecisionGrant permission
Decided16 May 2005
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by South Dublin County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Site 24, Magna Business Park, Fortunestown, Jobstown and Gibbons Townlands, Tallaght, Dublin 24.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- SD06A/0074Construction of a warehouse/distribution centre with offices and associated facilities, total area 2275sq.m., with signage, car park and associated site works. / 0.1 km away / 15 May 2006Granted
- SD25A/0027WMinor modifications to previously approved plans (Reg Ref SD21A/0238 + SD23A/0206) of existing (2390m²) light industrial facility at Unit 25 Magna Drive, Magna Business Park, Citywest, Co Dublin D24 PVY8. Modifications include- 1)Provision of additional Warehouse/Assembly and Office staff facilities totalling 523m² additional floor area based on- a)The provision of an additional warehouse/assembly floor area at 1st floor mezzanine level (441m²). b)In addition to the ground and 1st floor mezzanine office/staff facilities granted permission (Reg ref SD21A/0238) provision of) provision of office/staff facilities at ground and 1st floor mezzanine levels which will result in 82m² additional floor area. 2)Minor alterations to Elevations to include: a)New 1st floor mezzanine escape doorway and external stairs to side (East) elevation. b)New staff entrance side (East) elevation. c)New windows to front (North), East and West Elevations. d)New Ventilation louvred panels to front (North) and East Elevations. 3)In addition to the 38 no. car parking already granted (Reg ref SD21A/0238), 7 no. additional car parking spaces (45 no. spaces in total). 4)Relocation of previously approved Electricity substation and switch room (Reg Ref SD23A/0206) to the North of the site adjacent to the vehicular access. 5)Relocation of previously approved waste management and Plant enclosures. 6)New pedestrian gates and vehicular barriers. 7)Signage totem adjacent to the vehicular access. 8)all associated site landscaping and drainage works. / 0.1 km away / 07 April 2025Granted
- SD21A/0238Change of use of the existing warehouse/distribution facility (2,390sq.m) to a light industrial use facility for the production, assembly and distribution of plastic assemblies for healthcare and biopharmaceutical industries; provision of additional floor area at first floor mezzanine level (290sq.m) resulting in a total floor area of 2,680sq.m comprising 910sq.m of ancillary floorspace, including ancillary office areas (263sq.m), staff changing facilities, staff canteen, toilets and plant rooms; external works to the existing building including the installation of a secure gated enclosure to the rear of the building containing air handling equipment, a new escape doorway in the side (east) elevation of the building, a new access footpath; 10 new car parking spaces (including 2 disabled spaces and 4 EV spaces with charging points) (resulting in a total of 38 spaces); new bin store; new bicycle parking provision; removal of existing sign; erection of new illuminated sign (3.6sq.m); all associated soft and hard landscaping works; solar panels; all piped infrastructure; plant and any other works above and below ground associated with the proposed development. / 0.1 km away / 21 October 2021Granted
- SD23A/0206Construction of a detached single storey ESB substation with switch room & associated site landscaping & drainage works. / 0.1 km away / 19 October 2023Granted
- SD25A/0240WThe development will consist of the installation of approximately 658.63 sq.m of Photo-Voltaic Solar Panels onto the existing roof. The solar panels will be used to create green electricity, all of which will be used by building. / 0.1 km away / 24 November 2025Granted
- SD22A/0325Extension of an existing warehouse by approximately 1,685sg.m and the addition of 1 loading dock, extension of existing loading yard and upgrade of 11 parking spaces for E.V charging, 2 spaces to accessible parking spaces, and the addition of 35 covered bicycle parking spaces all on a site of approximately 1.6 hectares in the townland of Fortunestown. / 0.1 km away / 07 February 2023Granted
- SD05A/0315Extension to the existing warehouse of a total area of 1,685sq.m., truck parking area; loading yards and loading docks; connection to water supply, foul sewer/surface water drainage; site development and landscape works; all on a site of 1.6 hectares in the townland of Fortunestown. / 0.1 km away / 29 June 2005Granted
- SD06A/0266Retention of development for a change of signage on the north and west elevation. / 0.1 km away / 02 June 2006Granted