SD05A/0366: 4,563sq.m. concrete yard for the storage and distribution of goods (at present scaffolding tubes & planks) together with landscaping, boundary fencing and site development works.
Site 530, Greenogue Industrial Estate, Rathcoole, Co. Dublin.
DecisionGrant permission
Decided13 October 2005
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD05A/0292Revised site plan, site boundaries, building footprint, floor plans and elevations comprising the construction of 2 no. blocks (previously 1 no. block), overall height 8.25m, (previously 11.25m) totalling 876sq.m. (previously 1,204sq.m.) of warehousing including 120sq.m. (previously 355sq.m. on 2 floors) of integral related office accommodation on ground floor, 58sq.m. of staff facilities on ground floor, 178sq.m. of mezzanine storage at first floor plus 2,840sq.m. of yard for storage and distribution of goods associated with the warehouse use, (each block totalling 438sq.m. warehousing including 60sq.m. of integral related office accommodation on ground floor, 29sq.m. of staff facilities on ground floor, 89sq.m. of mezzanine storage at first floor plus 1,420sq.m. of yard for storage and distribution of goods associated with the warehouse use) together with entrances, outfall drains, services utilities, boundary fences, landscaping, planting paving and associated site development work all at previously approved site 518 (Reg. Ref. SD03A/0066 - PL 06S.204281), Phase 5. / 0.1 km away / 14 June 2005Granted
- SD06A/1097Change of use of the existing building from a warehouse to a waste and materials transfer station. / 0.1 km away / 17 May 2007Granted
- SD22A/0310A new waste handling building (561sqm and 12m high); Use of an existing building (159 sqm and 7.5m high) granted retention under SD22A/0100 for waste handling; elevational treatment including signage to the northern facade of the existing building granted retention under SD22A/0100; continued use of the existing building (427 sqm and 8.2m high) granted permission under SD06A/1097 and all ancillary site works. The development will comprise an activity requiring a review of the existing waste facility permit (WFP-DS-11-0002-06). The proposed development includes an increase in the total maximum annual waste intake to 20,000 tonnes. An Environmental Impact Assessment Report has been submitted with this application. / 0.1 km away / 19 September 2022Granted
- SD15A/0074Waste Handling/Materials Storage/Transfer Building 561sq.m & 12m high plus ancillary site works on the site of the existing waste handling facility. / 0.1 km away / 11 December 2015Granted
- SD08A/0330Alteration to previously granted planning application Reg. Ref. SD07A/0466. The alterations include relocation of ground and first floor office in both Block D (143sq.m.) and Block E (116sq.m. total) plus revised elevations. The overall floor areas and heights for Block D and E remain unchanged and as per granted planning permission Reg. Ref. SD07A/0466 as follows - Block D 461sq.m./8.5m high; Block E 289sq.m./8.55m high. / 0.1 km away / 10 July 2008Granted
- SD06A/01793 no. warehousing blocks as follows: (1) Block A (8.2m high, divided into a maximum of 3 units) totaling 741sq.m. including 114sq.m. of ancillary office/staff facilities on ground floor with mezzanine above, (2) Block B (8.2m high, divided into a maximum of 3 units) totaling 741sq.m. including 114sq.m. of ancillary office/staff facilities on ground floor with mezzanine above, (3) Block C (8.5m high) totaling 798sq.m. including 182sq.m. of ancillary office/staff facilities on 2 floors together with services, utilities, fencing, landscaping, planting, paving, parking and site development works. / 0.1 km away / 08 May 2006Granted
- SD22A/0100Retention of existing building (159.25) currently not in use. Proposed use is intended as a recycling facility and this will be subject to a separate application. / 0.1 km away / 01 June 2022Granted
- SD07A/0496Construction of 1 no. light industrial unit 1,936 m2 total, 10.25 m high to be sub-divided into a maximum of 11 units, including a total of 337sqm of integral ancillary office accommodation on 2 floors and 257sqm of staff facilities plus associated services, utilities, fencing,gates, landscaping, planting, paving, parking and all site development works. / 0.1 km away / 21 August 2007Granted