SD06A/0568: Provision of roads and services infrastructure to facilitate the future development of a business park, to be known as 'Profile Park' on these lands. The development includes the provision of 1,675 metres of internal distributor roads consisting of 267 metres to dual carriageway standard (at the main entrance) with a further 1,408 metres to single carriageway standard and one internal roundabout. The development also includes surface water drainage, foul drainage and water supply infrastructure, associated landscaping and all ancillary works, on a site of 39.84 hectares. Access to the site will be provided at the northern boundary off the existing roundabout to Kilcarbery Business Park. This application is accompanied by an Environmental Impact Statement.
Nangor Road, Ballybane, Clondalkin, Dublin 22.
DecisionGrant permission
Decided30 November 2006
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD06A/0568/EPProvision of roads and services infrastructure to facilitate the future development of a business park, to be known as 'Profile Park' on these lands. The development includes the provision of 1,675 metres of internal distributor roads consisting of 267 metres to dual carriageway standard (at the main entrance) with a further 1,408 metres to single carriageway standard and one internal roundabout. The development also includes surface water drainage, foul drainage and water supply infrastructure, associated landscaping and all ancillary works, on a site of 39.84 hectares. Access to the site will be provided at the northern boundary off the existing roundabout to Kilcarbery Business Park. This application is accompanied by an Environmental Impact Statement. / 0.0 km away / 13 January 2012Granted
- SD07A/0665A 'Trade Park' consisting of 35 units in 5 separate blocks and a single office/showroom building (5 units). The units range in scale from 171 sqm (gross floor area) to 1,519 sqm (gross floor area) with a total gross floor of approx. 10,998 sqm, and 336 no. parking spaces. Each trade park unit (in Blocks B to F) shall be for trade park use only comprising storage/enterprise/workshop use and customer service/showroom/sales space for both trade and public customers. Block A (804 sqm) is a signature two storey building comprising of 4 no. units for office and showroom use and a coffee shop of approx. 120 sqm (in Unit 2); Block B (2,130 sqm) is a double height single storey building (including 534 sqm at mezzanine level) comprises of 9 no. units for trade park use; Block C (2,130 sqm) is a double height single storey building (including 534 sqm at mezzanine level) comprises of 9 no. units for trade park use; Block D (1,519 sqm) is a double height single storey unit for trade park use with single storey element to North elevation; Block E (3,195 sqm) is a double height single storey building (including 795 sqm at mezzanine level) and comprises of 15 no. units for trade park use; Block F (1,519 sqm) is a double height single storey unit for trade park use with single storey element to North elevation. The development also includes surface water drainage, 3 no. ESB substations, foul drainage and water supply infrastructure, yard areas, associated landscaping and all ancillary works, on a site of approx 3.54 hectares. Access to the site will be provided from the Northern boundary off the existing roundabout to Kilcarbery Business Park, via the internal road network permitted under Reg. Ref. SD06A/0568. / 0.1 km away / 09 October 2007Granted
- SD08A/01131 no detached logistics / distribution warehouse unit with ancillary offices (total floor area c.1842 m.sq.m) and associated site works including storm - water, attenuation, water services and boundary fencing / 0.1 km away / 09 April 2008Granted
- SD24A/0100WAmendments to a development granted permission under Reg. Ref. SD21A/0167 for a gas fired power plant in Profile Park, Baldonnel. Permission is sought for revisions to the permitted Above Ground Infrastructure (AGI), associated with Gas Network Ireland’s high-pressure gas supply to the power plant which include: • the provision of an E & I kiosk, a regulators & meters kiosk, a gas analyser kiosk, and revisions to the boiler house kiosk with boiler flues. • the provision of a new stormwater attenuation design to serve the AGI compound; • minor revisions to the permitted internal road to serve the AGI; • minor revisions to the permitted fencing surrounding the Gas Pressure Reduction Skid located to the north of the proposed AGI; and • all associated and ancillary works. No changes are proposed to the gas fired power plant or to the site access permitted under Reg. Ref. SD21A/0167. The development permitted under Reg. Ref. SD21A/0167 includes activities which are subject to an Industrial Emissions Licence (Ref Number P1196-01). / 0.2 km away / 21 June 2024Granted
- SD21A/0167Construction of a gas fired power plant with an electrical output of up to 125MW with associated balance of plant, equipment and buildings including; an Engine Hall building with a height of 18.9m, comprising 6 gas engines and ancillary infrastructure; an Electrical Annex Building with a height of 18.7m; a Workshop building with a height of 5. 1m; a Tank Farm building with a height of 5.68m; a Security hut with a height of 3.27m; an Exhaust Stack with a height of 31.8m; a Gas AGI including a kiosk with height of 3.3m; Radiator Coolers with a height of 8.46m; 2 electrical transformers with a height of 4.98m; Tanks including 2 x Diesel Oil Storage Tanks (volume of 2500m3 combined); SCR Urea Tank (26m3); Lube Oil Storage Tank (26m3); Lube Oil Maintenance Tank (26m3); Pilot Oil Tank (26m3); Fire Water Storage Tank (1000m3); Effluent Collecting Tank (26m3); Underground Surface Water Attenuation Tank (490m3); 2 new access onto the existing private road network with Profile Park; 12 parking spaces, footpaths, landscaping; fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage. An EIAR was submitted with this application. / 0.2 km away / 19 July 2022Granted
- SD10A/0063New 8m diameter sprinkler tank (8.5m in height) and pump house (floor area 30sq.m) to the rear of existing semi detached warehouse unit and associated site works on prviously approved development Reg. Ref. SD08A/0052 on a 0.45 Ha site. / 0.2 km away / 19 May 2010Granted
- SD24A/0162WWe, Vantage Data Centers DUB11 Ltd. are applying for permission for development at this site on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townland of Ballybane within Profile Park, Clondalkin, Dublin 22. The development will consist of an amendment and modification of the permitted Gas Networks Ireland (GNI compound that was granted as part of, and under SDCC Planning Ref. SD21A/0241 that will include: - Replacement of the permitted vehicular access to the GNI compound from within the data centre campus to being directly off Legacy Drive that will include a modified internal access road; - New internal layout of the GNI compound that will include the replacement of the permitted boiler kiosk (42sqm), skid kiosk (89sqm) and analyser kiosk (3sqm); with a single storey boiler house kiosk (19.7sqm); single storey regulators / meters kiosk (36.8sqm); single storey electrical kiosk (14.6sqm); as well as all associated infrastructure and ancillary works; and - 3 no. floodlighting columns (each 8.537m in height) within the GNI compound that will be surrounded by a 3m high fence and vehicle gates. / 0.2 km away / 19 August 2024Granted
- SD17A/0377Revisions and alterations of the permitted development of a data processing facility under planning Ref: SD12A/0002 on a 3.85 hectare site. The revised application consists of alterations to the DUB14 (previously DUB12) data centre/warehouse structure, granted in the previous application. The alterations to the DUB14 (Previously DUB12) include: (i) 2 data halls 2137 sq.m (increase of 180sq.m), (ii) offices/reception 478sq.m (decrease of 190 sq.m), (iii) support space/staff facilities and internal plant with a floor area of 953sq.m (increase of 84sq.m), (iv) external plant of 1,777sq.m (footprint increase of 35sq.m). The data centre part of the building is single storey reaching a maximum of 8.6 m in height. The plant area is to a maximum of 10.5m high and the office building has been lowered one storey and is 9.1m in height (decrease from 12.3m). The development will be constructed in 5 phases, currently Phases 1 & 2 have been completed with the enabling site works and 2 substations and single warehouse building to the North of the site. The subsequent phases will contain a single warehouse building starting with Phase 3, the application in which this Site Notice relates. A total of 84 (60 at the end of Phase 3) car parking spaces will be provided together with recycling storage and all ancillary services and landscaping. There will be 2 site entrances from vehicular accesses permitted as part of business park infrastructure (SD06A/0568). / 0.2 km away / 15 December 2017Granted