SD07A/0517: Construct 6 no. windows (3 no. at ground floor, 3 no. at first floor) to western elevation, change of use of existing first floor storage to offices and construct 2 no. stairs and lift to serve the first floor.
Unit W1, Tallaght Business Park, Whitestown, Dublin 24
DecisionGrant permission
Decided20 September 2007
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD09A/0085/EPDemolition of existing office and light storage warehouse (which was previously granted permisison for alteration and extension under SD06A/0808) and the erection of a new 2 storey replacement office unit, lecture hall, storage areas, the recladding of the existing ESB substation, reinstatement of car parking and associated site development works. / 0.1 km away / 02 January 2014Granted
- SD13A/0076Demolition of the existing single storey offices and associated elevational modifications to retained warehouse building and site. / 0.1 km away / 18 June 2013Granted
- SD09A/0085Demolition of existing office and light storage warehouse (which was previously granted permisison for alteration and extension under SD06A/0808) and the erection of a new 2 storey replacement office unit, lecture hall, storage areas, the recladding of the existing ESB substation, reinstatement of car parking and associated site development works. / 0.1 km away / 24 April 2009Granted
- SD06A/0808Extensions and alterations to an existing single storey and part two storey office/warehouse building comprising a 29.5sq.m. ground floor extension, a 682.1sq.m. first floor extension, a 682.1sq.m. second floor extension, new signage on the west and north elevations, minor alterations to the existing elevations, re-landscaping of the site to provide additional car parking spaces and associated site works; retention of change of use from warehouse use to office use (area 379.6sq.m.) over two floors within the existing warehouse. / 0.1 km away / 31 May 2007Granted
- SD10A/0244Change of use from factory to Youth Training centre. / 0.1 km away / 05 October 2010Granted
- SD19A/0224Cladding 27.35m long section of gable wall to manufacturing building, all associated works. / 0.2 km away / 04 September 2019Granted
- SD12A/0237New storage unit (approximately 3m high) near the south elevation of the manufacturing facility, together with all associated works; this application will be covered by the existing Integrated Pollution Control License Ref: P0079-03. / 0.2 km away / 23 January 2013Granted
- SD15A/0385Increasing the height of the roof by approximately 0.9m; increasing the height of the plantroom by approximately 1.7m; alterations to the external perimeter of building and modifications to the building interior. The works will also include the installation of two new extract air fans and associated ductwork on the roof, together with all associated works. This application will be covered by the existing Integrated Pollution Control Licence Ref: P0079-03. / 0.2 km away / 23 February 2016Granted