SD07A/0742/EP: The demolition of the existing industrial warehouse structure; the construction of a replacement warehouse structure with signage (approx. 3,893sqm gross floor space) including ancillary office space; 44 no. car parking spaces; 1 no. totem sign (approx. 10m in height); security access gate on northern boundary; boundary treatment; landscape works; and all associated site developments all on a site area of approx. 0.914 hectares. The proposed replacement structure will rise to an overall height of approx. 19.3m. It is proposed to maintain vehicular access to the site via the existing site entrance.
Unit 4, John F. Kennedy Park, Killeen Road, Bluebell, Dublin 12
DecisionGrant extension of duration of permission
Decided11 September 2012
Application typeExtension Of Duration Of Permission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 4, John F. Kennedy Park, Killeen Road, Bluebell, Dublin 12?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD07A/0742The demolition of the existing industrial warehouse structure; the construction of a replacement warehouse structure with signage (approx. 3,893sqm gross floor space) including ancillary office space; 44 no. car parking spaces; 1 no. totem sign (approx. 10m in height); security access gate on northern boundary; boundary treatment; landscape works; and all associated site developments all on a site area of approx. 0.914 hectares. The proposed replacement structure will rise to an overall height of approx. 19.3m. It is proposed to maintain vehicular access to the site via the existing site entrance. / 0.0 km away / 29 May 2008Granted
- SD05A/0120Two storey extension for industrial use with associated offices. / 0.1 km away / 18 July 2005Granted
- SD06A/0925Construct a 198sq.m. extension (13.4m high) to side and raise the roof height of part of existing building from 8.3m to 13.4m. / 0.1 km away / 19 December 2006Granted
- S99A/0299Alterations and improvements to the existing vehicular access to processing plant. These improvements include relocation of 1 no. pillar and the set back of the existing fenceline to the north of the existing entrance for a distance of approximately 155m. / 0.1 km away / 06 July 1999Granted
- S01A/0031Insertion of 2 no. windows in the front elevation. / 0.1 km away / 14 March 2001Granted
- SD05A/0453Retention of the internal first floor offices. / 0.1 km away / 29 July 2005Granted
- SD02A/0608Insertion of a first floor window in the front elevation. / 0.1 km away / 22 November 2002Granted
- SD04A/0547Demolition of existing road side metal railing and gates, construction of new sliding gates and side gate setback from the road and installation of sign beside road. / 0.1 km away / 14 September 2004Granted