SD07A/1058: Redevelopment of a light industrial building which was previously subdivided into two units totalling 1199 sq. m. Construction of a new building on the site of Unit No.1 to provide 679 sq. m. approximately of warehouse area over one storey and 565 sq. m. approximately of associated office area over two storeys. Units No 1 and No 2 (E1) will be connected internally so that they amalgamate to form one single unit on the site totalling 2710 sq. m. approximately. The proposed redevelopment will include hard and soft landscaping, drainage works, signage and other associated works.
E1, E2, E3 Ballymount Industrial Estate, Ballymount Drive, Walkinstown, Dublin 12
DecisionGrant permission
Decided18 June 2008
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- S00A/0053(A) Retention of internal first floor extensions within existing industrial unit. (B) Additional alterations including construction of new internal stairs, relocation of door on the eastern elevation. / 0.0 km away / 30 March 2000Granted
- SD02A/0518Extension of existing warehouse. / 0.0 km away / 26 May 2003Granted
- S02A/0113Alterations to approved building layout Ref. S01A/0622 incorporating an automatic cash dispensing machine to front of building and any ancillary contingent works / 0.0 km away / 17 April 2002Granted
- S01A/0622Redevelop existing filling station incorporating: demolition of existing shop building and portion of existing tyre centre building; a new two-storey building comprising a convenience store with ancillary office and stores of 298sq.m; a new 5m high canopy to replace existing canopy; 4 no. 40,000 litre underground storage tanks to replace 3no. tanks; a new automatic brush wash facility; a 6m high company sign to replace existing sign, new corporate signs and insignia and any ancillary contingent works. / 0.0 km away / 04 February 2002Granted
- SD06A/1045Demolish existing advance tyre centre structure destroyed by fire and construct new replacement structure to include signage on the same site. / 0.1 km away / 08 February 2007Granted
- SD20A/0307Construction of a new industrial unit for storage and office purposes, the relocation of an existing fire escape door on existing Unit D1, and all associated site works. / 0.1 km away / 07 April 2021Granted
- SD03A/0512Extension to existing premises comprising showrooms/offices and workshop also signage. / 0.1 km away / 02 September 2003Granted
- SD08A/0095Upgrading existing elevations to include revised fenestration, canopy to front and side entrances, new parapet cladding to all side and gable elevations and new thru coloured plaster finish throughout / 0.1 km away / 04 April 2008Granted