SD11B/0298: Increase in roof ridge height to provide for a loft conversion; provision of dormer windows to rear roof elevation.
70A, Limekiln Road, Walkinstown, Dublin 12
DecisionGrant permission
Decided30 September 2011
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 70A, Limekiln Road, Walkinstown, Dublin 12?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD05B/0026Demolition of an existing garage to side and provision of a two storey extension comprising of porch and dining room at ground floor level and 1 no. bedroom at first floor level to side. / 0.1 km away / 07 March 2005Granted
- SD16B/0117Two-storey pitched roof rear extension, new window to side elevation and associated site works. / 0.1 km away / 03 June 2016Granted
- SD22A/0437New single storey prefabricated building containing a classroom of 79.5sqm and associated site works located on the eastern boundary of Riverview Educate Together's external play area. / 0.1 km away / 19 January 2023Granted
- SD17A/0152New single storey prefabricated building containing three classrooms of 62.3sq.m each and clinical office suite of 165sq.m and the renovation of the existing school building (excluding the rooms and external play area currently being used by Riverview Educate Together) for temporary use by Setanta Special School at Saint Peter’s School, Limekiln Road, Greenhills, Dublin 12. The new single storey prefabricated building is proposed to be located on the north west corner of the site along with associated ground works. The proposed renovation works are to consist of a new 2 storey lift and escape stairs on the north east elevation, the removal of existing windows and double doors in the existing stair core and the addition of a new first floor window and new ground floor double doors on the south east elevation of the existing stair core, a new external door from a classroom on the north west elevation, new escape double doors from the hall on the north west elevation, new wheelchair ramps at the main entrance, the existing escape stairs and to the two playgounds, new fences to enclose playgounds, new road markings for parking and minor ground works. / 0.1 km away / 12 July 2017Granted
- SD19A/0207Single storey prefabricated building containing three classrooms of 79.8sq.m each; the new single storey prefabricated building is proposed to be located on the north corner of the site along with associated ground works. / 0.1 km away / 21 August 2019Granted
- SD21A/0341Single storey prefabricated building containing a classroom of 79.5sq.m. and two special education teaching rooms of 14.5sq.m. each and associated site works. The new single storey prefabricated building is proposed to be located in front of the Riverview Educate Together school entrance to the north-west. / 0.1 km away / 19 April 2022Granted
- SD07B/0618First floor dormer extension, consisting of a bathroom with a rooflight to rear of dwelling. / 0.1 km away / 10 September 2007Granted
- SD06A/0598Demolition of the existing school hall and the construction of a new school hall area 408sq.m. to include a mezzanine, office floor, wc facilities, changing rooms, stage, covered walkway connecting to existing school, all with associated site works & boundary & landscaping. / 0.1 km away / 05 September 2006Granted