SD12A/0158: Change of use from existing warehouse with associated offices to new leisure use to provide climbing wall facilities and associated administration offices, meeting rooms and changing rooms with alterations to front and rear elevations with new front entrance and removal of roller shutter to rear elevation, including new externally list signage to front elevation.
Unit 3C, Sunbury Industrial Estate, Ballymount, Dublin 12
DecisionRefuse permission
Decided26 September 2012
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD15A/0377Change of use from an existing industrial unit to a cultural and sports centre to include for new internal floor layouts, male and female toilets, kitchen, ancillary rooms and stores, change of existing elevations and all associated siteworks. / 0.1 km away / 17 February 2016Refused
- S99A/0230Construction of new commercial building to include office and storage facilities. / 0.1 km away / 10 June 1999Refused
- S01A/0283Construction and installation of our new washdown bay & jet wash unit. / 0.1 km away / 21 September 2001Refused
- SD20A/0216/EPExtend the existing service workshop to provide additional service bays and covered secure parking. / 0.1 km away / 04 February 2026Refused
- SD25B/0409Single storey rear extension an attic conversion with dormer roof to rear plus changing of existing roof profile from hipped to new gable roof plus internal alterations to existing ground floor layout and all associated site works. / 0.2 km away / 11 August 2025Refused
- SD12A/0159/EPRetain car dismantling facility; retain necessary sheds; retain car body crusher (some existing unauthorized sheds will be demolished); erect new entrance and road boundary fence; install CP20BP interceptor; necessary drainage and associated site works. / 0.2 km away / 01 February 2018Refused
- SD11A/0021The site consists of the temporary open storage of motor vehicles for recycle, reclaim & resuable parts (site area 0.129 hectares) & 1 no. workshop building (75.43 sq.m.) & 1 no. storage building (34.46 sq.m.) & 1 no. administration building (80.61 sq.m.) with 2 no. staff car parking spaces. / 0.2 km away / 22 March 2011Refused
- SHD3ABP-313129-22Demolition of the former Chadwicks Builders Merchant development comprising 1 two storey office building and 9 storage/warehouse buildings ranging in height from 3m - 9.9 m as follows: Building A (8,764sq.m), Building B (1,293sq.m), Building C (two-storey office building) (527sq.m), Building D (47sq.m), Building E (29sq.m), Building F (207sq.m), Building G (101sq.m), Building H (80sq.m), Building I (28sq.m), and Building J (44sq.m), in total comprising 11,120sq.m.; (ii) the construction of a mixed-use Build-to-Rent residential and commercial development comprising 633 build-to-rent apartment units (292 one-beds, 280 two-beds and 61 three-beds), 1 childcare facility and 10 commercial units in 4 blocks (A-D) ranging in height from 5 to 12 storeys as follows: (a) Block A comprises 209 apartments (102 one bed-units, 106 two bed units and 1 three bed units) measuring 5 - 10 storeys in height. (b) Block B comprises 121 no. apartments (53 one bed-units, 45 two bed-units and 23 three bed-units) measuring 8 - 10 storeys in height. (c) Block C comprises 130 apartments (38 one bed units, 71 two bed units and 21 three bed units) measuring 8 - 12 storeys in height. (d) Block D comprises 173 apartments (99 one bed-units, 58 two bed-units and 16 three bed-units) measuring 6 - 10 storeys in height. All apartments will be provided with private balconies/terraces; (iii) provision of indoor communal residential amenity/management facilities including a co-working space, communal meeting room/ work space, foyer, toilets at ground floor of Block A; gym, changing rooms, toilets, resident's lounge, studio, laundry room, communal meeting room/ work space, multi-function space with kitchen at ground floor of Block B; games room with kitchenette, media room, co-working space, resident's lounge, communal meeting room/ work space, reception area, management office with ancillary staff room and toilets, toilets, parcel room at ground floor of Block C; (iv) the construction of 1 childcare facility with dedicated outdoor play area located at ground floor of Block A; (v) the construction of 8 commercial units at ground floor level of Blocks A, B and D, and 2 commercial units at second floor level (fronting Greenhills Road) of Block C as follows: Block A has 3 units at ground floor comprising 79.46sq.m., 90.23sq.m., and 121.39sq.m., Block B has 1 unit at ground floor comprising 127.03sq.m., Block C has two units at second floor comprising 120.85sq.m. and 125.45sq.m, and Block D has 4 units at ground floor comprising 84.45sq.m, 149.77sq.m, 155.48sq.m and 275.59sq.m; (vi) the construction of 3 vehicular entrances; a primary entrance via vehicular ramp from the north (access from Greenhills Road) and 2 secondary entrances from the south for emergency access and services (access from existing road to the south of the site) with additional pedestrian accesses proposed along Greenhills Road;(vii) provision of 424 no. car parking spaces comprising 398 standard spaces, 21 mobility spaces and 5 car club spaces located at ground floor level car park located within Block A and accessed via the proposed entrance at Greenhills Road, a two-storey car park located within Blocks C and D also accessed from the proposed entrance at Greenhills Road and on-street parking at ground floor level adjacent to Blocks A and C. Provision of an additional 15 commercial/ unloading/ drop-off on-street parking spaces at ground floor level (providing for an overall total of 439 car parking spaces). Provision of 4 dedicated motorcycle spaces at ground floor level parking area within Blocks C and D;(viii) provision of 1363 bicycle parking spaces comprising 1035 residents' bicycle spaces, 5 accessible bicycle spaces and 7 cargo bicycle spaces in 9 bicycle storerooms in ground and first floor parking areas within Blocks A, C and D, and 316 visitors' bicycle spaces located externally at ground floor level throughout the development;(ix) provision of outdoor communal amenity space (5,020sq.m) comprising landscaped courtyards that include play areas, seating areas, grass areas, planting, and scented gardens located on podiums at first and second floor levels; provision of a communal amenity roof garden in Block C with seating area and planting (176sq.m); and inclusion of centrally located public open space (3,380sq.m) adjacent to Blocks B and C comprising grassed areas, planting, seating areas, play areas, water feature, flexible use space; and incidental open space/public realm; (x) development also includes landscaping and infrastructural works, foul and surface water drainage, bin storage, ESB substations, plant rooms, boundary treatments, internal roads, cycle paths and footpaths and all associated site works to facilitate the development. This application is accompanied by an Environmental Impact Assessment Report (EIAR). The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Development Plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes the relevant Development Plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. / 0.2 km away / 27 July 2022Refused