SD13A/0107: Construction of a 257sq.m. extension 26m x 9.875m x 13.1m high to the southern end of the existing warehouse, including a 65sq.m. plant mezzanine; construction of a visitor car park with 10 spaces to be located at the entrance to the site; construction of a staff car park with 26 spaces to be located along the northern boundary of the site. This application relates to a development which comprises or is for the purpose of an activity requiring an Integrated Pollution Control Licence.
Takeda Ireland Ltd, Grange Castle Business Park, Clondalkin, Dublin 22.
DecisionGrant permission
Decided24 July 2013
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD17A/0118The erection of 2 illuminated, 1.75m high x 4.7m wide Takeda company logo signs at heights of 36.945 metres to the north elevation & 30.945 metres to the east elevation of the existing 37.07metre high production building, and associated works. / 0.0 km away / 01 June 2017Granted
- SD16A/0044Construction of a 254.32sq.m extension of 13.0m x 21.02 x 8m high to the northern end of the existing drum store, and associated works. This application relates to a development which comprises or is for the purposes of an activity requiring an Integrated Pollution Control Licence. / 0.0 km away / 11 April 2016Granted
- SD12A/0073The construction of a Waste Water Treatment Plant to be located at the south western corner of the manufacturing site. The proposed plant will consist of an MCC/Storage/Control building 6.93m x 13.16m x 3.55m high; 5 no. storage tanks 7.4m diameter x 6.0m high; a galvanised steel pipe-rack 7.7m high x 3.0m wide x 125m long; a paved access road and miscellaneous concrete aprons and hardstands. This application relates to a development which comprises or is for the purposes of an activity requiring an Integrated Pollution Control Licence or a Waste Licence. / 0.1 km away / 14 August 2012Granted
- SD18A/0169New single storey electrical building at a height of 4.15m with an area of 136sq.m., an external utility yard for 2 low voltage containerised generators, 2 step up transformers and an above ground, double-skinned, bunded, bulk storage fuel tank for the purpose of standby power generation. Modifications to existing berm and the addition of a new grassed berm are also to be included all on a 10.3 hectare site. This application relates to development on a site which carries out an activity that requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended. / 0.1 km away / 09 July 2018Granted
- SD22A/0303Construction of a Volatile Organic Compound (VOC) Abatement system comprising of a thermal oxidiser (TO), associated plant equipment and scrubbers positioned on a bunded concrete plinth with a maximum single stack height of 12m along with two access platforms at 2.5 high and 5.0m high used for maintenance only; The system is set within a 489sq.m (including a bunded area of 213sq.m) concrete compound enclosed by a 2.4m high paladin weldmesh black fence to match the existing utilities perimeter fence; 135sq.m single storey utilities workshop will sit adjacent to the Volatile Organic Compound (VOC) abatement system compound with associated hardstanding area and soakpit; 55m (L) x 3.2m (W) x 5.6m (H) pipe rack extension with the addition of a second tier extension 118.6m (L) X 3.2M (W) 1.2m (H) to the existing pipe rack is required to service the new VOC abatement system compound; a contractor's compound 3,420sq.m comprising single stacked portacabins, workshops, parking for 30 contractors, materials delivery and set down area; the compound will be enclosed by a 2.4m tall paladin weldmesh black fence; modifications to the existing internal access road will include the addition of a new access road and footpath around the VOC abatement system compound and utilities workshop; a permanent pedestrian crossing including associated signage at the existing access road giving access between the contractor's compound and the voe abatement system compound; modifications to the existing site lighting, signage, surface water, foul and process wastewater drainage, hard and soft landscaping including a 3m high planted berm to the north of the contractor's compound; An EIAR (Environmental Impact Assessment Report) will be submitted with the application; this application relates to development which comprises an activity requiring an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended. / 0.1 km away / 07 September 2022Granted
- SD20A/0147Construction of P3 Phase II expansion of the existing P3 biopharma production facility which includes the construction of a circa 2,155sq.m, two storey biopharma production facility to a maximum height of circa 14.9m to be located to the south of the existing P3 building; single storey administration extension of circa 210sq.m to a maximum height of 4m to the north of the existing P3 building and internal modifications to the existing P3 building in addition to all associated site works including delivery area; courier pick up/drop off area with 5 parking spaces (including 1 accessible parking space and 1 E-car space); extension to existing external utilities yard (circa 485sq.m) for 3 heat pumps and other ancillary equipment; new internal site circulation road and re-alignment of existing circulation road; 48 additional car parking spaces (including 3 accessible parking spaces and 5 E-car spaces); 24 covered bicycle stands, hard and soft landscaping and external lighting; there will be temporary site entrance and associated temporary access road located to the south east of the site during the construction phase all on 3.68 Hectare application site located within the Takeda Ireland facility at Grange Castle Business Park; an EIAR (Environmental Impact Assessment Report) is submitted with the application and relates to development comprising of an activity which requires and Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended. / 0.1 km away / 08 October 2020Granted
- SD17A/0388Amendments to the previously approved application SD17A/0019 consisting of: removal of escape stair to the west elevation of the main building and inclusion of escape ladder, re-arrangement of nitrogen storage area and decreased size of nitrogen tank, removal of VOC stack, removal of louvre screen to main building roof and replaced with steel handrail, inclusion of extra flues to main building roof, removal of pump house from site, re-arrangement of fencing to perimeter of main building. Amendments also include some changes to external doors and windows to both the electrical and main building. / 0.1 km away / 15 December 2017Granted
- SD17A/0019Construction of a new predominantly single storey Pharma production facility at a height of 15.95m with partial 2 storey plant room & enclosed roof top plant platform, single storey electrical building 126sq.m, an external utility yard for tanks and equipment and a single storey pump house 16sq.m. The main facility has a total floor area of 2998sq.m approx. The proposed development will also include signage, bicycle shelter, smoking shelter, waste storage area, underground fire water storage tank, 37 car park spaces (of these 3 spaces are accessible & 4 E-Car Spaces); new hard and soft landscaping and modifications to existing berm, circulation roads and footpaths are also to be included, temporary construction access to east of the site, new site fence to match existing and retain existing temporary access point into new fence line for the purposes of emergency access only and all associated site works. An EIS (Environmental Impact Statement) will be submitted with this application, all on an 8.4 hectare site. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended. / 0.1 km away / 27 March 2017Granted