SD16A/0059: Playing pitch, including associated site works, on a site area of 1.97 hectares, located on Oldcourt Lane, south of Oldcourt Road, Oldcourt, Ballycullen, Dublin 24. Access to the pitched will be via an existing lane off Oldcourt Road.
Site south of Oldcourt Road and East of Oldcourt Lane, Oldcourt Road, Ballycullen, Dublin 24
DecisionGrant permission
Decided09 November 2016
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Site south of Oldcourt Road and East of Oldcourt Lane, Oldcourt Road, Ballycullen, Dublin 24?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD20A/0149New LED floodlighting system of 6 columns at 21.3m in height; installation inclusive of all associated ducting, column foundations and bases and all LED lighting fixtures. / 0.0 km away / 04 May 2021Granted
- SD23B/0474A 2-storey side and rear extension comprising of a playroom on ground floor, 2 no. bedrooms on first floor, new first floor window to rear & side elevations of existing house, partially raise boundary wall to join into top of existing wall level along roadside elevation and all associated site works. / 0.1 km away / 10 January 2024Granted
- SD15A/0150Construction of 79 two storey houses (68 3 bedroom houses and 11 4 bedroom houses) with photovoltaic panels at roof level, a new vehicular access from Oldcourt Road, pedestrian access routes, internal roads and footpaths, open space including children's play area, boundary treatments, hard and soft landscaping, changes in levels, ancillary surface water attenuation areas and all site development works above and below ground. / 0.1 km away / 03 December 2015Granted
- SD22B/0502Attic Conversion for storage with dormer window to the front roof area / 0.1 km away / 23 January 2023Granted
- SD18A/0025Development as part of a permitted residential development (under Reg. Ref. SD15A/0150), which is currently under construction and is known as Ballycullen Green, which is located south of Oldcourt Road, Oldcourt, Firhouse, Dublin 24. The permission being sought consists of a change of house type and increase in number from 37 permitted houses to 41 proposed houses. The proposed development is comprised of 5 2-storey, 4 bed detached houses, 34 2-storey, 4 bed semi-detached houses and 2 2-storey, 3 bed semi-detached houses, all on a site area of 1.02 hectares. The proposed development also includes for all associated site development works and the effect of the proposed development will be a modification to an extant permission under Reg. Ref. SD15A/0150. / 0.1 km away / 25 April 2018Granted
- SD24B/0063The Conversion of existing attic in to a bedroom & ensuite bathroom which incorporates a new dormer window to the roof on the front elevation / 0.2 km away / 16 April 2024Granted
- SD21A/0137Provision of a temporary two storey post-primary school (Firhouse Educate Together Secondary School: Roll No. 68307J), comprising 10 classrooms and 3 specialist classrooms including all ancillary teacher and pupil facilities (2,000sq.m. gross floor area approximately); provision of an internal vehicular drop-off area and internal circulation routes; 15 surface parking spaces; bicycle parking; ball courts and play areas; access to the proposed temporary school will be from Oldcourt Road; provision of piped infrastructure and ducting; plant; pedestrian access points; ESB substation; attenuation tank; landscaping and boundary treatments; ancillary ramps and stairs; signage; changes in level and all associated site development and excavation works above and below ground; on a 0.86ha site approximately, which forms part of a larger 1.77ha landholding earmarked to accommodate a future permanent post-primary school; temporary permission for a period of 5 years is being sought. / 0.2 km away / 20 July 2021Granted
- SD23A/0149New educational campus, to be delivered on a phased basis comprising 1 No. part 3 storey, 1,000 pupil Post Primary School (Firhouse Educate Together Secondary School: Roll No. 68307J) and includes accommodation for children with special educational needs, a multi-purpose hall and all ancillary teacher and pupil facilities with a gross floor area of c. 11,021 sq.m; The development will also include and permanently incorporate elements of the temporary two storey postprimary school development (permitted under An Bord Pleanála Ref: ABP-311141-21; South Dublin County Council Reg. Ref. SD21A/0137), including vehicular access from Oldcourt Road; 3 ball courts; 2 pedestrian and cyclist access points and 1 pedestrian only access point to the northern boundary of the site; car parking; surface water drainage; attenuation tanks; piped infrastructure and ducting; changes in level and all associated site development and excavation works above and below ground; The development will also include minor revisions to the previously permitted car parking area to allow for the provision of additional car parking spaces to serve the Post Primary School; The development will also include 3 additional ball courts and play areas; 1 storage building (c. 48 sq.m); car parking; electric vehicle charging points; bicycle parking; hard and soft landscaping; waste management provision; cycle and pedestrian routes; boundary treatments; ancillary ramps and stairs; signage; attenuation tank; PV panels; boiler and plant; surface water drainage and SuDS measures (including green roofs); 3 flag poles; street and security lighting; piped infrastructural services and connections; changes in level and all associated site development and excavation works above and below ground; The development will also consist of the retention of an ESB substation located to the south of the vehicular entrance at Oldcourt Road. / 0.2 km away / 21 March 2024Granted