Castle House, 2001 Castle Drive, Citywest Business Campus, Citywest, Dublin 24
Planning application SD16A/0332
DecisionGrant permission
Decided16 March 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by South Dublin County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Castle House, 2001 Castle Drive, Citywest Business Campus, Citywest, Dublin 24?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- SD20A/01271 x 50 KWp solar photovoltaic (PV) will consist of 154 PV panels on the warehouse roof and will occupy an area of 254sq.m. / 0.0 km away / 15 September 2020Granted
- SD18A/0051Retention of 1 Totem Sign Unit, complete with all associated site works. / 0.0 km away / 10 April 2018Granted
- SD21A/0040Retention of modifications to the permitted ground floor layout to include a reduction in the area of the permitted hot food deli, the inclusion of a second deli/servery, both selling hot and cold food for consumption on and off the premises, and changes to the associated seating areas, all remaining subsidiary to the overall use of the premises as a service station. / 0.1 km away / 19 April 2021Granted
- SD15A/0043Construction of a new service station to incorporate a single storey amenity building of 350sq.m gross floor area comprising a convenience retail store of 99sq.m, an internal seating area, a hot food deli, ancillary food preparation, storage, staff, plant and toilet areas and an external courtyard storage area; forecourt with four pump islands, canopy with an illuminated fascia over and 2 no. 40,000 and 1 no. 60,000 litre underground fuel storage tanks with associated pipework and overground fill points; 38 car parking spaces, 2 motorbike parking spaces, electric car charging point, air/water services area and bicycle parking; car wash facility; landscaping works; company signage throughout the site; new vehicular access from Garter Avenue; all associated site and development works. / 0.1 km away / 25 May 2015Granted
- SD25A/0234WThe development comprises of permission for new signage elements and site development works. As well as retention permission for various minor amendments to the development permitted under South Dublin County Council Planning Reference SD22A/0282. Specifically, 3no additional high power electric vehicle charging units, bollards, and 6no parking spaces, relocation of existing light column and previously approved substation, and all associated site development works. / 0.1 km away / 17 November 2025Granted
- SD22A/0282A high powered electric vehicle charging station consisting of the: (1) Installation of 2 No: Electric vehicle charging bays, and comprising a parking space and electric vehicle charging unit (2) Installation of a prefabricated ESB substation (3) Erection of associated signage (4) All associated lighting, infrastructure and site development works / 0.1 km away / 15 August 2022Granted
- SD17A/0037Retention for the mezzanine floor and stairs, roof light and automatic opening vents to the warehouse section. / 0.1 km away / 05 April 2017Granted
- SD07A/0975External lettering and logo signage to front facade of building. / 0.1 km away / 07 February 2008Granted