Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin 12
Planning application SD16A/0396
DecisionGrant permission
Decided06 April 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by South Dublin County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin 12?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- SD16A/0396/EPTwo storey extension and alterations to existing school including all associated site works. / 0.0 km away / 23 August 2022Granted
- SD24A/0211WRetention planning permission and planning permission for development at Holy Spirit Junior Primary School, Greenhills, Walkinstown, Dublin12. The development will consist of: (1) Retention of existing single storey prefabricated classroom building including all associated site works. (Planning Reference: SD17A/0184 (2) Planning permission to retain the temporary prefabricated classroom building including all associated site works as granted under planning reference SD17A/0184 for a further period of 5 years. / 0.0 km away / 24 October 2024Granted
- SD17A/0184Installation of four single storey temporary prefabricated classroom buildings including all associated site works. / 0.0 km away / 08 August 2017Granted
- S01A/01462 storey extension to the rear, to accommodate a disability access lift / 0.1 km away / 07 June 2001Granted
- SD04B/0414Single storey extension to rear, conversion of domestic garage at the side to a study with a semi-dormer first floor above accommodating a bedroom and bathroom and alterations to front facade to include a tiled overhang over entrance and windows. / 0.1 km away / 28 October 2004Granted
- SD16A/0391Amendment to previously granted planning permission (ref. SD16A/0218) incorporating alterations to layout plan and external facade of building. / 0.1 km away / 12 January 2017Granted
- SD16A/0218Single storey extension and alterations to existing school including all associated site works. / 0.1 km away / 16 August 2016Granted
- SD22B/0452Extension at first floor level to side above existing garage / utility comprising of 19.5sq.m including extending existing tiled roof; Extend 7sq.m to existing ground floor kitchen extension to rear (Reg. K-829 July 1976); Provide access to attic for additional wc / shower, inline roof lights and playroom; Porch to front 2.5sq.m with lean to tiled roof extending to cover garage door; Widen vehicle entrance to 3.5m to allow for access for 2 off-road parking spaces. / 0.1 km away / 30 November 2022Granted