SD16A/0459: Extension of existing workshop to the rear (additional 541.5sq.m); alterations to the front facade.
Unit 18, First Avenue, Cookstown Industrial Estate, Dublin 24
DecisionGrant permission
Decided04 April 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD08A/0413Removal of existing boundary treatment to full perimeter of site. Proposed new boundary treatment to full perimeter of site including 2m high wall with security fencing on top. Proposed new gated vehicular entrance with partial dishing of kerb and proposed repositioning of existing gated vehicular entrance and partial dishing of kerb and all ancillary works. / 0.0 km away / 11 August 2008Granted
- SD08A/0377Detached, 2 storey, commercial warehouse, 160sq.m including office space overhead / 0.1 km away / 28 July 2008Granted
- SD04A/0181Change of use from welding consultants training service to retail shop and ancillary rooms at ground floor level and restaurant and ancillary rooms at first floor level to be served by new access stairs with staff changing and toilets of stairwell at ground floor level, in addition to new ground floor entrance screen and first floor window over, on front elevation and two new first floor windows on rear elevation. / 0.1 km away / 16 June 2004Granted
- S98A/0662Demolition of 138 sq.m. of office/toilet/canteen area and the demolition of 330 sq.m. of store/warehouse area to the rear of the existing and the construction of 733 sq.m. of office in two stories and the construction of 1,643 sq.m. of warehouse/storage in a single bay to the rear and the associated site works and the provision of 38 extra car parking spaces to the front of the development to cater for the overall increase in warehouse and office area. / 0.1 km away / 09 March 1999Granted
- S98A/0809Retention of first floor areas within building and retention of signage. / 0.1 km away / 28 January 1999Granted
- SD24A/0215WDemolition of 29.5m2 loading bay and removal of 3 no. storage containers and ancillary 5 no. storage tanks with extension of 394m2 9.0m high warehouse extension with 2 no. roller shutters with internal layout changes for installation of new energy efficient and sustainable equipment to existing commercial laundry with 7 no. new car parking spaces, 24 no. new bicycle spaces in secure standalone shelter with new delivery and loading area covered with new canopy and revised internal vehicular routes while retaining existing entrances to Second Avenue with ancillary site and development works. / 0.1 km away / 17 February 2025Granted
- SD24A/0017Single storey attached metal storage unit floor area of 11sq.m and metal canopy to front elevation; Internal extension of first floor area by 50sq.m / 0.1 km away / 15 March 2024Granted
- S99A/001724m high antennae, support structure, antennae and associated equipment shelter. / 0.1 km away / 14 July 1999Granted