SD16B/0189: (1) Partial demolition of existing lounge to rear; (2) new development to include: (a) Increased floor area to existing lounge extension to rear; (b) sitting room extension & porch to front; (c) reduction in width of existing vehicular access to front c/w new pillars/boundary walls (to match existing heights), to include amendments to existing apron; (d) replacement of existing driveway to front, c/w new feature flowerbeds; (e) ancillary services.
13, Redwood View, Dublin 24
DecisionGrant permission
Decided14 September 2016
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 13, Redwood View, Dublin 24?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD07A/0085(a) Construction of a new two storey 4 bedroom detached house in side garden, (b) construction of new vehicular entrance onto public road for proposed house and all site ancillary works. / 0.1 km away / 30 October 2007Granted
- SD02A/0624Canopy to front elevation and drive-in, 4 bed 2 storey house to side and new drive-in from hammerhead and new drive-in to new house rear garden from Treepark Road, Kilnamangh. / 0.1 km away / 12 December 2002Granted
- SD04B/0552Living room and porch extension to front / 0.1 km away / 09 December 2004Granted
- SD24B/0348WThe proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 4no. electric vehicle charging bays & 2no. charging units. II. Installation of a new ESB Unit Substation. III. Installation of a new CT Metering cabinet. IV. Associated revisions to existing car parking spaces & landscaped area. V. Erection of associated signage. VI. All associated site development works including lighting, drainage infrastructure and line marking. / 0.1 km away / 26 September 2024Granted
- SD06A/0469Two storey detached house (184sq.m.) to side of existing two storey house with new vehicular access and associated site works. / 0.1 km away / 02 August 2006Granted
- SD18A/03822 storey, 3 bedroom detached dwelling at side including front vehicular gate entrance for existing dwelling and the widening of vehicular entrance for new dwelling. / 0.1 km away / 27 March 2019Granted
- SD06A/0940An automatic rollover carwash to replace the existing jet wash and ancillary contingent works at Shell Kilnamanagh Service Station. / 0.1 km away / 03 January 2007Granted
- SD23A/0211Construction of two new warehouse units (481 sqm each), namely unit 69A and 70A, with ancillary offices located to the north-west of the existing unit 70 and the north-west of the existing unit 69, the reconfiguration of twelve parking spaces to the front of each of the new warehouse units and associated site works. / 0.1 km away / 22 April 2024Granted