SD17X/0001: South Dublin County Council intends to lodge an application with An Bord Pleanála under section 175(3) of the Planning & Development Act 2000 (as amended) for the approval of the “Dublin Mountains Visitor Centre” Development. The site of the proposed development is Coillte's Hell Fire and Massy's Wood forest properties (totalling c.152 ha) in the townlands of Mountpelier, Killakee and Jamestown in South Dublin. Development is also proposed along stretches of the R115 and R113 regional roads connecting the site to the urban areas of Woodtown and Ballycullen to the north. Development is also proposed along stretches of the R115 and R113 regional roads connecting the site to the urban areas of Woodtown and Ballycullen to the north. The proposed development includes (a) the conversion of 26 ha of Coillte’s Hell Fire forest property from productive conifer forest to mixed deciduous woodland for use primarily as amenity open space; (b) modifications, including new sections of trail, and upgrade of the existing network of walking and equestrian trails throughout the Hell Fire and Massy’s Wood forest properties; (c) construction of a ‘tree canopy walk’/pedestrian bridge over the R115 to link the trail networks of the two properties, with a ‘bridge house’ at the Hell Fire end of the bridge; (d) conservation works to the Hell Fire Club building (South Dublin Record of Protected Structures ref. 388) and the architectural heritage of the Massy’s Wood property including the walled garden (part of South Dublin Record of Protected Structures ref. 384); (e) installation of heritage interpretation signage along the network of trails; (f) construction of a new parking area for 275 no. cars (including 14 no. disabled spaces) and five coach spaces to replace the existing parking area on the Hell Fire forest property; (g) construction of a visitor centre comprising two buildings (one single storey and one two-storey) side-by-side at an elevation of c. 300m on the Hell Fire forest property, with a combined gross floor area of 980 sqm, accommodating the following uses/spaces: audio-visual/exhibition facility (101 sqm), education room (55 sqm), café with seating area (175 sqm), servery (36 sqm) and kitchen (60 sqm), ‘Ramblers’ Lounge’ (43 sqm), retail (45 sqm), kiosk (27 sqm), toilets (66 sqm), facility management offices (55 sqm), and associated reception, circulation, plant and storage spaces; (h) construction of a stand-alone electricity substation (23 sqm); (i) installation of a new watermain line and sewage pipe under the R115 from the Hell Fire property to the existing watermain and public sewer network; (j) construction of a network of swales and ponds for attenuation of surface run-off, and a culvert beneath the R115 to channel overflow of surface water into the Glendoo Brook; (k) modifications to the existing entrance to the Hell Fire forest property; (l) installation of new fences along sections of the Hell Fire property boundary; (m) all ancillary works and landscaping on the Hell Fire and Massy’s Wood properties. It is proposed to make modifications to the stretches of the R115 and R113 roads connecting the site to the urban area to the north, including the provision of a footpath (minimum 1.5m width) and an advisory cycle lane (1.5m width), and the retention of a carriageway of sufficient width for two-way traffic except at one location where a single lane traffic shuttle is proposed. The proposed modifications to the roads do not require encroachment into adjoining private lands, but do require localised widening of the R115 by 1.2m into the Massy’s Wood property for a stretch of c.100m. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development. The application and the EIAR may be inspected free of charge during office hours, or purchased at the offices of South Dublin County Council, County Hall, Tallaght, Dublin 24, and An Bord Pleanála, 64 Marlborough Street, Dublin 1, until 25 September 2017
Coillte's Hell Fire and Massy's Wood forest, in the townlands of Mountpelier, Killakee & Jamestown, in South Dublin.
DecisionGrant approval
Decided24 October 2022
Application typeApplication Under Part 10
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Coillte's Hell Fire and Massy's Wood forest, in the townlands of Mountpelier, Killakee & Jamestown, in South Dublin.?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD03B/0446Extensions and alterations to existing house including first floor bedrooms over existing single storey structure. / 0.5 km away / 23 October 2003Granted
- SD14B/0142New driveway entrance piers (leading to 'Hollybank') consisting of 2 no. 0.675 x 0.675 x 2.25 metre high piers to match existing piers (leading to 'Woodside') with associated new wrought iron gates; 15.6 linear metres x 0.7 metre high entrance stone wall; associated site works. / 0.5 km away / 11 July 2014Granted
- SD15B/0243Alteration and extension of an existing 3 bed single storey dwelling, comprising the provision of a single storey bedroom over an existing car port, a single storey bay window extension and pergola both to rear of dwelling, the provision of a free standing single storey room and shed to rear garden and sundry works to site. / 0.6 km away / 07 September 2015Granted
- SD06B/0083Provision of new 2-storey extension to rear with combination mono-pitch and flat roof and high-level windows, single-storey extension over basement to side with flat roof and associated roof terrace, and provision of new retaining wall to rear of site; works to include sundry internal alterations and associated landscaping and site works. / 0.6 km away / 03 November 2006Granted
- SD23B/0465The Development requiring permission will consist if Construction of new dormer window to the front at attic level. Modifications to facades and internal layout and all associated ancillary Landscaping and site development works. The development requiting retention permission Weill consist of retention of the existing single storey detached garden storage to the front. Retention of the existing two storey detached ancillary recreational building to the rear. Retention of the existing storey porch to the ide. Retention of the retaining walls to the rear and sides / 0.6 km away / 05 January 2024Granted
- SD09B/0222Modifications to planning SD08B/0148 to include: conversion of attic space to bedroom & ensuite; 6 additional skylights (2 north facing, 4 south facing) & 1 window to the east & 1 west; remodelling of existing roof to create gable to east & west; remodelling of existing roof to create gable east to west; repositioning of chimney; glazed walkway between attic & granted first floor; replace window with door to east elevation & 1 large window with 2 smaller to north elevation; inclusion of local stone cladding; reduction of cedar cladding to new extension; increase in size of windows to kitchen & bedrooms 1 & 2; removal of 2 first floor windows to east; new windows to utility room to south, to shower room to north & to ensuite 4 to west; move window in ensuite 1 to south; removal of glazed roof & inclusion of 1 skylight; revisions to the internal layout with an increase in footprint by 1.1sq.m. - there are no alterations to height of the building; increase to 1.8m of stonewall to east boundary/Kilakee Road. / 0.6 km away / 20 October 2009Granted
- SD08B/0148The refurbishment and renovation of the existing house including the demolition of the ancillary structures to the houses, the provision of a two storey extension to the rear and associated landscape and site-works. / 0.6 km away / 30 April 2008Granted
- SD13A/0102Multi-user telecommunications tower measuring 18 metres in height, 3m wide at its base with associated antennae and link dishes and an associated communications cabin (measuring approx. 7.6sq.m.) adjacent to the base of the tower and the erection of security fencing around the tower area using 2.4m palisade fencing, along with associated landscaping and site works. / 0.6 km away / 17 July 2013Granted