RefusedDecided 26 June 2018South Dublin County Council

SD18A/0075: (a) Partial change of use of existing light industrial unit to recreation facility/family entertainment centre, (b) permission for removal of existing roller shutter door located along the front elevation and insertion of glazed unit incorporating double pedestrian doors at ground floor level with windows at first floor level, (c) internal modifications to include reception area, play school, revised toilet arrangements, kitchen/servery and all ancillary spaces pertinent to that of a family entertainment centre at ground floor level and office space/storage at mezzanine level, (d) revised pedestrian escape door arrangement along side elevation, (e) enclosed secure bin store to be located to front of building, (f) connection to all existing mains services on-site and all associated development works.

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10
DecisionRefuse permission
Decided26 June 2018
Application typePermission
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

Refusal reasons not machine-readable

Documents are indexed. Reason extraction for South Dublin has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →