GrantedDecided 17 September 2018South Dublin County Council

SD18A/0268: Alterations to Reg. Ref. SD16A/0216 which involved demolition of remaining part of fire damaged building and the construction of a warehousing unit which is now being revised. The alterations comprise: (A) Reconfiguration of internal floor arrangement of Industrial building from -2,100sq.m. of light industrial unit to 1,973sq.m; 154sq.m of ancillary offices on 2 floors with 39sq.m of staff facilities to 220sq.m of offices with 188sq.m of staff facilities; 189sq.m of mezzanine storage to 43sq.m. The above reconfiguration comprises: (1) change of use of light Industrial area to office/staff facilities area (75sq.m) and office/staff facilities to light industrial area (10sq.m.) at ground level; mezzanine to office/staff facilities (78sq.m) and light industrial area (110sq.m) at first floor level; office/staff facilities to light industrial area (8sq.m). (2) Provision of new staff facilities area (15sq.m) and mezzanine (43sq.m) within the previous granted industrial building footprint (total revised area 339sq.m). (B) Elevation revisions associated with the floor plan/layout adjustments including rearrangement of fire doors and level entry goods door to the east elevation, removal of a dock leveller to the rear elevation and change of cladding type and colour on all sides of the building. (C) Site plan revisions including access adjustments to provide 2 access/egress gate for HGV’s and cars as opposed to previous proposed separate access/egress for HGV’s and cars and 1 pedestrian gate plus minor drainage alterations. Site boundary and height of the proposed industrial unit is not affected by this altered proposal.

Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.
DecisionGrant permission
Decided17 September 2018
Application typePermission
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for South Dublin has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Huntsman House, Ballymount Cross Industrial Estate, Dublin 24.?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.