SD19A/0086: An extension (600sq.m) to a storage shed (1805sq.m) (Ref.SD12A/0156); cover for 3 existing ground level aggregate storage bays (c.651sq.m); 2 storage containers at quarry garage (c.28.8sq.m); 1 storage container at quarry void (c.28.8sq.m); removal of 2 storage containers (c.59sq.m); extension to storage shed within the retail shop yard (172.5sq.m) (Ref. SD16A/0239) on a site of 0.1822 hectares.
Belgard and Cheeverstown Townlands, Fortunestown, Tallaght, Dublin 24
DecisionGrant permission
Decided08 May 2019
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD23A/0343New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry. / 0.1 km away / 03 May 2024Granted
- SD16A/0410Retention of: (1) plant/parking storage area (c.1457sq.m); (2) truck/car parking area (c.653sq.m); (3) fuelling station (129.7sq.m) & 2 fuel containers (c. 25sq.m & 23sq.m); (4) 4 transportation garage truck wash out bays (c. 433.5sq.m); (5) bunded fuel storage tanks (233sq.m); (6) oil interceptor; (7) 3 storage containers (30.2sq.m each); (8) truck/car parking area (592sq.m); (9) transportation garage & office with two storey back office/canteen/stores (2036.9sq.m), 2 storage portacabins (16.4sq.m & 10.5sq.m), 1 storage container (c. 7.5sq.m) & generator; (10) 1 lamp post (7.8m high); (11) bunded fuel storage (74sq.m); (12) 5 lamp posts (5.7m high); (13) 5 lamp post from 6.6m to 7.2m high; (14) screening berm (3.7m high by 106m long & 936sq.m); (15) car park for transportation garage & office staff (924sq.m); (16) 1 lamp post (7.8m high); (17) sprinkler system; (18) lab/offices (503.7sq.m) & 3 storage containers (30sq.m each) with 'Biocycle' effluent treatment system; (19) central waste storage container area (c. 860sq.m); (20) 1 storage container (11.9sq.m); (21) metal recycling storage area (c. 324sq.m); (22) 2 lampposts (6.7m & 10m high); (23) fuel/storage shed & fuel tank (162.6sq.m); (24) aggregate storage bays (c. 306sq.m); (25) waste (stone/brick) storage bays (c. 71sq.m); (26) mould blocks storage area (c. 45sq.m); (27) paving plant (2,110sq.m) with elevated feed hopper; (28) 1 storage container (26.4sq.m); (29) rumbler plant (106.8sq.m); (30) packing plant & rumbler (243.8sq.m); (31) 3 security light towers (15.2m & 21.2m & 8.9m high); (32) concrete block/paving storage yard (c. 4.2ha); (33) block plant 2 (3210sq.m); (34) 2 storage porta cabins (27.6sq.m & 34.1sq.m); (35) office/canteen/changing rooms/toilets (c. 133.67sq.m), 1 storage container (c. 14.2sq.m) & 1 storage porta cabin (c. 9.3sq.m); (36) central orders office (85.3sq.m); (37); 1 lamp post (8.8m high); (38) sample storage area (c. 78sq.m); (39) aggregate storage bay (c. 330sq.m); (40) aggregate storage bays (762sq.m); (41) workshop & stores (c. 164.6sq.m); (42) mortar plant (c. 170.8sq.m), substation (14.1sq.m) & stores (29.1sq.m); (43) block plant 1 (3604sq.m) & feeder hopper conveyor to block plant (c. 322sq.m); (44) 'Flomix' silo storage area (c. 299sq.m); (45) Dry Mortar 'Flomix' plant (c. 452sq.m) & storage container (15sq.m); (46) storage bays (427sq.m); (47) 1 Security Cameras Post (7.8m high); (48) sprinklers system; (49) 4 security light tower (1 at 22.1m & 3 at 16.9m high); (50) 2 truck containers (c. 29.2sq.m each); (51) 1 storage container (c. 21.8sq.m) & water tank (9.3sq.m); (52) attenuation pond (c. 4176sq.m); (53) water tank (c. 35sq.m); (54) 1 lamp post (8.8m high); (55) 5 concrete truck wash out bays (c. 322.5sq.m); (56) 1 container (14.1sq.m); (57) block & concrete dispatch office (c. 97.9sq.m); (58) effluent pump station (c. 12.5sq.m); (59) aggregate storage area (c. 1.95ha); (60) roller crusher mill (65.8sq.m); (61) 'Skako' concrete plant (c. 330sq.m) & 2 storage containers (c. 22sq.m & c. 14sq.m); (62) aggregate storage bays (c. 582sq.m); (63) contracts plant storage yard (c. 4311sq.m); (64) 4 contracts yard storage containers (3 at 11.9sq.m & 1 at 29.8sq.m); & all ancillary site development works, internal roads & landscape planting. / 0.2 km away / 29 June 2017Granted
- SD19A/0223Concrete plant (715sq.m) with a maximum height of 18 metres; extension to the extension to the existing Dry Mortar 'Flomix' plant (302sq.m) with a maximum height of 33.3 metres (Ref. SD16A/0410); truck wash out bays (187sq.m); a water storage tank (35sq.m.); ancillary facilities within a 1.50 hectare application area at the existing quarry. / 0.2 km away / 13 November 2019Granted
- SD23A/0265The development within an area of 4.1 hectares will comprise of: A new concrete plant (7,271 sq metres), comprising enclosed mixing units, 16 no. cement silos (c. 23 metres height), enclosed aggregate storage bins (c. 16.5 metres height), feed conveyor systems, & 2 no. control rooms; a replacement truck wash out facility (1,237 sq. metres); and related ancillary works within a 4.2 hectare application area at the existing quarry. The new concrete plant will replace the three existing concrete plants on site, all of which will be decommissioned upon commencement of operation of the new plant. / 0.2 km away / 11 December 2023Granted
- SD24A/0183WThe development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343. / 0.3 km away / 12 September 2024Granted
- SD16A/0293Retention of the following: (1) Quarry control office & garage (1835sq.m) & 5 storage portacabins (14sq.m,14sq.m, 14sq.m 12.6sq.m & 8.4sq.m); (2) ESB switching station (58sq.m) & substation (36sq.m); (3) spare parts storage area (c. 2445sq.m); (4) maintenance shed (117.7sq.m); (5) car park (30 spaces & 627.7sq.m); (6) 2 lampost (10.5m high); (7) 'Clause 804' plant (1177.7sq.m); (8) wet sand plant (684.4sq.m); (9) 2 weighbridges (325.4sq.m); (10) general waste storage area (c. 12.5sq.m); (11) quarry fuelling station with two 9m3 fuel tanks (126.8sq.m); (12) metal recycling storage area (c.310sq.m); (13) truck parking area (c. 6632sq.m); (14) 1 security camera post (2.2m high); (15) 1 lamp post (9.2 high); (16) hydrocarbon interceptor; (17) tyre storage bays (c.140sq.m); (18) dry sand pant (2203.4sq.m); (19) 1 lamp post (10.3m high); (20) quarry stores (163sq.m); (21) effluent holding tank; (22) security station (13.9sq.m) and 2 lamp post (6.5m high); (23) wheel wash (236.3sq.m); (24) 'Tricel' effluent treatment system; (25) settlement lagoon system (3208.9sq.m); (26) sand polishing filter; (27) security fence (2.9m high); (28) overburden storage mound (7.3 ha); (29) perimeter screening berm (5m to 8m high by 1.6km long & 6ha); (30) perimeter screening berm (5.2m high by 310m long & 7930sq.m); (31) plant storage area ( 8356sq.m); (32) perimeter screening berm (9.2m high by 147 long & 4770sq.m); (33) screening berm (8.4m high by 340m long & 5257sq.m); (34) perimeter screening berm (6.5m high by 240m long & 5665sq.m); (35) perimeter screening berm (9m high by 320m long & 1ha); (36) screening berm (2.7m high by 245m long &3125sq.m); (37) screening berm (3.5m high by 950m long & 1.1ha); (38) screening berm (3m high by 243m long & 3030sq.m); (39) screening berm (3.3m high by 238m long & 2088sq.m); (40) settlement pond area (6.4ha); (41) screening berm (3.5m high by 379m long & 4793sq.m); (42) screening berm ( 3.1m high by 244m long & 3743sq.m); (43) internal access road (285m long) to Outer Ring Road entrance/exit, gate, pedestrian gates, footpaths, paladin fencing (1.8m high) & 6 lampposts (6m high); (44) screening berm (5.2m high by 215m long & 4040sq.m); (45) relocation of entrance to C&D recovery site permitted under SD02A/0167 & all ancillary site works; internal roads & landscape planting. / 0.3 km away / 29 June 2017Granted
- SD12A/0156A recycled asphalt plant (RAP) addition to the existing asphalt plant and an open covered storage shed (1815sq.m.). / 0.3 km away / 21 September 2012Granted
- SD21A/03432 prefabricated units for use as an office (31.5sq.m) and a canteen (23.3sq.m) located adjacent to the existing permitted Retail Shop (Ref. SD16A/0239) within a 0.0125 hectare application area at the existing quarry. / 0.5 km away / 17 February 2022Granted