SD20B/0489: 2 storey extension to the rear of existing dwelling and retention of existing 2 storey extension to the rear of existing dwelling and all ancillary site works.
38 Killakee Walk, Firhouse, Dublin 24.
DecisionGrant permission & grant retention
Decided12 February 2021
Application typePermission and Retention
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 38 Killakee Walk, Firhouse, Dublin 24.?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- S01A/0096(a) 2 storey semi-detached house abutting existing detached house (b) new vehicular entrance and (c) single storey extension to front of existing house. / 0.0 km away / 12 July 2001Granted
- SD21B/0199Retention of existing 2 storey extension to the rear of existing dwelling and all ancillary site works. / 0.0 km away / 02 June 2021Granted
- SD25B/0397WConstruction of a single storey extension to the side and rear and a 2 storey extension to front of existing dwelling, new first floor front extension to form an enlarged bedroom, ground floor extension to form larger sitting room and hall and all ancillary site works. / 0.0 km away / 31 July 2025Granted
- SD12B/0272Construction of a single storey extension to the front elevation comprising entrance hall, cloakroom and living room accommodation. / 0.0 km away / 03 January 2013Granted
- SD13A/0095Change of use from retail space to veterinary clinic (daytime) to include interior alterations and alterations and new signage to existing shopfront. / 0.1 km away / 05 July 2013Granted
- SD23B/0155Conversion of existing attic to non-habitable space, raising of existing gable to form mini hip roof, window to side, velux to front & dormer to rear of existing dwelling. / 0.1 km away / 02 June 2023Granted
- SD12A/0259Erection of 2 no. new illuminated high level shopfront signs to underside of existing canopy and associated site works. / 0.1 km away / 20 February 2013Granted
- SD07A/0339Demolition and redevelopment of Firhouse Shopping Centre and construction of a new mixed use village centre on a site of 1.118 ha in 3 blocks around a new landscaped village square. The submission includes revised accommodation to include a single level underground car park of 7369 sq m consisting of 227 car spaces, refuse stores, bicycle parking and plant areas. Block A, 3 storeys over ground floor, comprises 11 no. retail units totalling 2824 sq m including an anchor supermarket of 1220 sq m with associated stores and staff welfare accommodation (existing service yard is retained), takeaway 95 sq m (unit 3), pharmacy 117 sq m (unit 5), and post office 70 sq m (unit 9), 1 no. ESB substation, a new "Day Care Centre" for the central remedial clinic of 490 sq m with associated ambulance parking (4 no. ambulance spaces and 3 disabled car spaces) an ATM at ground floor level, a creche of 300 sq m and a fitness centre of 1000 sq m on first floor level, three storeys of office space over ground floor entrance totalling 854 sq m and 30 no. 2 bed residential units. Block B, 3 storeys over ground floor comprises 7 no. retail units totalling 583 sq m including a betting office of 112 sq m (unit 16) and 9 no. 1 bed, 11 no. 2 beds and 3 no. 3 bed residential units (23 in total) and 1 no. ESB substation. Block C, comprises single storey restaurant/cafe unit 135 sq m and public lift and stair to carparking at basement level. 19 no. short stay surface car spaces are also provided at ground level adjacent to the Village Square. The development is to be carried out in two phases as described in the documentation to facilitate the continued operation of the anchor supermarket unit. In this regard, permission is also sought for the temporary relocation of the exixtind Day Care Centre (375 sq m), Pharmacy (75 sq m) and supermarket (1000 sq m) within the existing structure. The total gross floor area of the development, excluding basement areas, is 12,604 sq m. / 0.1 km away / 14 November 2007Granted