SD21A/0203: Modifications and minor additions to previously approved scheme (Planning Register Reference SD20A/0283) at this site of c.16.23ha (in total) comprising of the following changes to previously approved scheme SD20A/0283; Approved Central Administration Building (CAB), relocation of building to the east by approx. 7m; reconfiguration and setting out of building plans at all levels (including roof level) resulting in increase in building footprint of approximately 170sq.m (from 1,424sq.m to 1,594sq.m) associated changes to building elevations (design and finishes); approved single storey Cafeteria Element, additional basement level below cafeteria to accommodate plant; 9 rooflights (2.8 m diameter) and 9 rooflight (1.8m diameter), inclusion of MEP Plant on roof level including new flue extending approx. 1m above parapet; approved four-storey Office element, parapet at roof level to be raised by approx. 1.1m (increased from approved 19.5m in height to proposed 20.6m); overall increase in GIFA of 395sq.m; reconfiguration of area available for PV panels and sedum roof finish in order to accommodate required MEP equipment at roof levels. approved Data Centres - DUB14 and DUB15, reconfiguration and setting out affecting building locations and plans at all levels (including roof level) resulting in reduction in overall building footprint (for each building) by 48sq.m (from 13,442sq.m to 13,394sq.m), associated changes to staircases design, building elevations design and finishes, increase in parapet height of Vent Houses (at roof level) by approx. 350mm and omission of previously proposed zone of sedum roof finish; overall decrease in GIFA of 1,352sq.m in respect of DUB 14 and decrease of 1,453sq.m in respect of DUB 15; all plant equipment at ground level - reduced in height compared to approved layout so that the screening is deemed not required; DUB 14, reduction in height of approved flues by approx. 650mm, reduction in number of flues from 11 approved to 8 proposed; DUB 15, change to level of ground floor and associated increase in overall building height of approx. 700mm (parapet height increased from approved +83.0m O.D. to proposed +83.7m O.D.); reconfiguration of associated external plant at ground level (including generators / E-Houses & transformers) flues, omission of approved Modular Electrical Rooms (MERs) and associated screening serving approved Data Centres DUB14 &15; relocation, modifications to design and expansion of approved Water Treatment Building and associated plant to include, Water Treatment Tanks, 2 sprinkler tanks and relocated approved pump house (contained in the main Water Treatment Plant building) and 1 generator with additional proposed flue stack (height 30.75m) and 1 transformer; Gas Generator Compound - Relocation & reconfiguration of previously approved gas generator compound including, additional 4 generators (from 20 approved to 24 proposed), omission of approved E-houses; additional 7 electrical rooms, additional 7 flues (from 5 approved to 12 proposed); modifications to approved layout of internal site roads, yards and footpaths; relocation and modifications to design of approved Sprinkler Tanks and Pump Houses, Pump House serving DUB 14, relocated into proposed Water Treatment Building and compound, redesign of approved larger tank into proposed two smaller tanks; Pump House serving DUB 15, relocated to south of DUB15 the north facilitate space for electrical equipment redesign of approved larger tank into proposed two smaller tanks; relocation of Approved Gas Networks Ireland (GNI) gas skid & compound including approved 3 kiosk buildings; modifications to approved car park layouts and landscaping design; modifications to location and design of approved bicycle shelters; modifications to site development works, including underground water and building services provision, landscaping, internal security and compound enclosure fencing, and associated works; the remainder of the development (including permitted temporary construction car parking) to be carried out in accordance with parent permission SD20A/0283. An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence relating to lands located west of the existing MS Data Centre Campus and also a site located north of the main entrance to the business park from Grange Castle Road.
Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
DecisionGrant permission
Decided10 November 2021
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD25A/0017WMicrosoft Ireland Operations Ltd. intend to apply for permission for development at the Microsoft Campus, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22. The development will consist of the temporary provision of 9 No. generators (fuelled with Hydrotreated Vegetable Oil (HVO)) and associated site development works for a period to run concurrently with the lifespan of the permitted development under South Dublin County Council (SDCC) Reg. Ref. SD20A/0283 and SD21A/0203. The maximum height of the flue stacks associated with the generators is c. 30.95m. The temporary works will be removed when the permission expires. The application relates to a development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply. / 0.1 km away / 27 March 2025Granted
- SD24A/0019Amendments to a previously permitted development (Ref. SD21A/0203 which amended Ref. SD20A/0283); Amendments relate to the permitted Gas Skid Compound to provide layout details which will include the provision of a boiler house kiosk, Electrical & Instrumentation kiosk, regulators/meters kiosk, gas analyser kiosk and all associated infrastructure and site development works; The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Licence; The use of the site is an establishment to which the European Communities (Major Accident Hazards Involving Dangerous Substances) Regulations 2006 as amended by the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 apply. / 0.1 km away / 25 March 2024Granted
- SD16A/0088Site enabling works including demolition of existing vacant house and outbuildings (total floor area c.241sq.m), diversion of Baldonnel stream, provision of below ground attenuation. Development of 4 single storey data centres (DUB09, DUB10, DUB12, DUB13) located west of data centres DUB06 (existing), DUB07 & DUB08 (both granted under SD15A/0343), each data centre will contain the following: offices, computer and associated support areas, electrical component rooms, plant and associated equipment, plant at roof level and 5 flues each (each c.25m high) (gross floor area of each data centre c.17,598sq.m c.70,392sq.m in total). The height of each data centre will range between c.6.1m & c.13.3m high. Ancillary site works for connection to infrastructural services, as well as fencing, landscaping, perimeter service roads around the buildings. The provision for installation of heat dispersal infrastructure to facilitate the future potential recycling of waste heat energy by 3rd parties. 160 additional operational parking spaces (including universal accessible spaces). Provision of 20 bicycle parking spaces. Provision of 1 adiabatic water storage tank (c.273sq.m), 1 water treatment storage tank (416sq.m) and 2 pump houses (c.75sq.m each). Provision of 1,750 temporary construction worker parking spaces on adjoining Takeda and SDCC sites. All associated site development, service provision, landscaping ans associated works. This application includes modifications to permission ref. SD15A/0343 in relation to the lands west of permitted DUB07 & DUB08 now forming part of the current application. An Environmental Impact Statement (EIS) has been submitted with this application. / 0.2 km away / 06 May 2016Granted
- SD17A/0318The provision of a temporary (for 3 years) 18MW gas powered electricity generator compound to provide electricity to the DUB08 data centre located within the Microsoft Data Centre Campus, in advance of the upgrade of electricity infrastructure locally. The development will include 16 generators, gas skid compound and site compound (providing control cabinets, drying room, toilets and staff canteen – total floor area of buildings c.125sq.m). Temporary access arrangements via existing construction access from business park road. Provision of 10m high acoustic screen, palisade fencing and gates, staff parking, additional landscape screening. All associated site development, service provision, landscaping and other works. The temporary generator compound will be located within campus lands subject to an extant planning permission – Reg. Ref: SD16A/0088 (4 No. data centres; DUB09, DUB10, DUB12, DUB13) and the current application represents a modification to this permission. The compound will be located across part of the footprint of permitted data centre DUB12. It is intended that DUB12 and DUB13 will be constructed and permission Reg. Ref: SD16/0088 completed following decommissioning of the temporary generator compound. An Environmental Impact Assessment Report (EIAR) has been submitted with this application. / 0.3 km away / 27 October 2017Granted
- SD13A/0166Proposed single storey 74sq.m. extension to the south-east entrance of the existing DB3 Data Centre; the extension will house a proposed conference room with supporting storage and tea station, while the scope of works will also include alterations to the existing entrance lobby, security lobby and WC; alterations will include the removal of an existing conference room, the relocation of the primary access door from the north-east to the south-east facade; the installation of additional glazed curtain walling and insulated metal cladding to match existing and the provision of separate male and female toilet facilities. / 0.3 km away / 04 October 2013Granted
- SD20A/0283Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence. / 0.3 km away / 29 March 2021Granted
- SD16A/0087Site enabling works including demolition of existing vacant house and outbuildings (total floor area c.241sq.m), diversion of Baldonnell stream, provision of below ground attenuation and associated landscape works on a site of c.9.4ha located north of the Nangor Road and west of kilcarberry Business Park. / 0.3 km away / 09 May 2016Granted
- SD14A/0262A 111sq.m (gross) single storey extension to the north facade of the existing facility; the development includes connection to existing storm water drainage, process water drainage and associated site works required for the extension. / 0.3 km away / 04 February 2015Granted