SD22A/0045: Construction of 6 three bedroom dwelling houses; construction of proposed access road and footpaths; provision of car parking facilities to serve the proposed development which shall connect into existing adjoining foul sewer network; construction of a water surface sewer network to serve the proposed development including the connections/amendments to the existing adjoining surface water network; the provision of watermain to serve the proposed development and connection to existing adjoining water main; the provision of all necessary utility services and all ancillary site works.
St. Finians Way, Main Street, Newcastle, Co. Dublin
DecisionGrant permission
Decided03 October 2022
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD24B/0394The Development Consists of the retention permission for a utility/home office, at the above address. / 0.1 km away / 23 October 2024Granted
- SD19B/0100Retention for a garage containing a wc & tool store lock up. / 0.1 km away / 09 May 2019Granted
- SD15B/0138Retention of existing single storey side conservatory as constructed and all associated site works / 0.1 km away / 17 June 2015Granted
- SD14B/0269Construction of single storey side extension and all associated site works. / 0.1 km away / 17 December 2014Granted
- SD18A/0363(1) Construction of 22 three bedroom dwelling houses; (2) construction of access road and footpaths; (3) provision of car parking facilities to serve the development; (4) construction of a foul sewer network to serve the development which shall connect into adjoining foul sewer network; (5) construction of a surface water sewer network to serve the development including the provision of the necessary attenuation elements and the connection of the surface water network to the adjoining surface water network; (6) provision of a waterman to serve the development and connection to adjoining water main; (7) demolition of the garden sheds; (8) provision of all necessary utility services; (9) all ancillary site works. / 0.1 km away / 15 May 2019Granted
- S00B/0205Two storey extension (77.6sq.m) to existing two storey house (151.7sq.m) and conservatory to rear of proposed extension (10.3sq.m) / 0.1 km away / 29 May 2000Granted
- SD13B/0041New front porch and new domestic garage. / 0.1 km away / 16 April 2013Granted
- LRD23A/0011The proposal comprises the 2nd phase (phase 2B) of a 2 phase development (first phase [phase2A] under planning reg. ref SD23A/0136 will comprise 48 no. duplex dwellings and phase 2 of Taobh Chnoic public park of c.1.74 hectares of open space, along with car parking and ancillary infrastructure) to result in an overall Phase 2 development of 179 no. dwellings (consisting of 119 no. 2 storey houses and 60 no apartments / duplex apartments in 5 no. 3 storey duplex buildings, and ancillary infrastructure). The phase 2B development will consist of the construction of 131 no. dwellings and open space as follows: A) 119 no. 2 storey houses (10 no. 2 bedroom houses, 95 no. 3 bedroom houses, 13 no. 4 bedroom houses and 1 no. 5 bedroom house. B) 12 no. apartments / duplex apartments in 1 no. 3 storey building - (6 no. 2 bedroom apartments and 6 no. 3 bedroom duplex apartments) all with terrace. C) Open space (c. 1.34 ha. in a series of open space areas) hard and soft landscaping (including public lighting & boundary treatment), communal open space for duplex apartments and apartments; along with single storey bicycle/bin stores and ESB substations; D) Vehicle access from the Athgoe Road from a new signalised junction along with upgrades to footpath and pedestrian crossing (on the Athgoe Road) as well as provision of vehicular/pedestrian/cycle link to permitted 'Graydon' (TA06S.305343) 'Newcastle Boulevard' to the East as well as 237 no car parking spaces and 94 no. bicycle spaces (4 no. motorcycle space) and all internal roads, cycleways, green routes and paths. E) Provision of surface water attenuation SuDs measures connection to water supply and provision of foul drainage infrastructure as well as an underground local pumping station (in northern pa rt of site) to Irish Water specifications and all ancillary site development / construction / landscaping works. F) The proposal also includes upgrades (to provide surface water pipe upgrades) to the surface water network along Athgoe Road and Hazelhatch Road (for c. 1.2 km). / 0.1 km away / 19 March 2024Granted